Maida Saint Eufemia-Castrovillari Gas PIpeline is an operating gas transmission pipeline in Italy. The tracker lists 1 tracked segment, 102 km long, starting up in 1981. It is owned by Snam Rete Gas SpA.

Length

102 km

Capacity

Not reported

Segments tracked

1

Largest diameter 30480 mm (1200 in)

Route

Maida Saint Eufemia-Castrovillari Gas PIpeline runs from Italy. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Italy
End country
Italy
Countries crossed
Italy
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
113 km
GEM pipeline ID
P4287
Start year
1981
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingNot reported102Not reported30480 mm1981GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Maida Saint Eufemia-Castrovillari Gas PIpeline run?
Maida Saint Eufemia-Castrovillari Gas PIpeline is recorded in Italy. Global Energy Monitor reports no start and end points for it.
How long is Maida Saint Eufemia-Castrovillari Gas PIpeline?
Maida Saint Eufemia-Castrovillari Gas PIpeline is 102 km long.
How much gas can Maida Saint Eufemia-Castrovillari Gas PIpeline carry?
No design capacity is reported for Maida Saint Eufemia-Castrovillari Gas PIpeline. That is an absent figure, not a zero.
Is Maida Saint Eufemia-Castrovillari Gas PIpeline operating?
Maida Saint Eufemia-Castrovillari Gas PIpeline is operating, having started in 1981.
Who owns Maida Saint Eufemia-Castrovillari Gas PIpeline?
Maida Saint Eufemia-Castrovillari Gas PIpeline is owned by Snam Rete Gas SpA, as recorded in the current tracker release.

More gas pipelines in Italy

Listed in name order among the 142 pipelines tracked in Italy, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail