Gas transmission pipeline · Tłocznia Goleniów to Płoty
Goleniów–Płoty Gas Pipeline
Goleniów–Płoty Gas Pipeline is an operating gas transmission pipeline in Poland. The tracker lists 1 tracked segment, 42 km long, starting up in 2022. It runs from Tłocznia Goleniów to Płoty. It is owned by Gaz-System.
Length
42 km
Capacity
Not reported
Segments tracked
1
Largest diameter 700 mm (28 in)
Route
Goleniów–Płoty Gas Pipeline runs from Tłocznia Goleniów to Płoty. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Tłocznia Goleniów
- To
- Płoty
- Start country
- Poland
- End country
- Poland
- Countries crossed
- Poland
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 44 km
- GEM pipeline ID
- P3243
- Start year
- 2022
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Tłocznia Goleniów → Płoty | 42 | Not reported | 700 mm | 2022 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gaz-System100%
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Goleniów–Płoty Gas Pipeline run?
- Goleniów–Płoty Gas Pipeline runs from Tłocznia Goleniów to Płoty, crossing Poland.
- How long is Goleniów–Płoty Gas Pipeline?
- Goleniów–Płoty Gas Pipeline is 42 km long.
- How much gas can Goleniów–Płoty Gas Pipeline carry?
- No design capacity is reported for Goleniów–Płoty Gas Pipeline. That is an absent figure, not a zero.
- Is Goleniów–Płoty Gas Pipeline operating?
- Goleniów–Płoty Gas Pipeline is operating, having started in 2022.
- Who owns Goleniów–Płoty Gas Pipeline?
- Goleniów–Płoty Gas Pipeline is owned by Gaz-System, as recorded in the current tracker release.