Gas transmission pipeline · Poland
Hermanowice-Jaroslaw Pipeline
Hermanowice-Jaroslaw Pipeline is a proposed gas transmission pipeline in Poland. The tracker lists 1 tracked segment, 39 km long, starting up in 2029. It is owned by Gaz-System.
Length
39 km
Capacity
Not reported
Segments tracked
1
Largest diameter 17780 mm (700 in)
Route
Hermanowice-Jaroslaw Pipeline runs from Poland. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Poland
- End country
- Poland
- Countries crossed
- Poland
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 34 km
- GEM pipeline ID
- P1349
- Start year
- 2029
- Estimated cost (GEM, US dollars)
- $42.5 million
- EU Projects of Common Interest
- On the 4th list
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Not reported | 39 | Not reported | 17780 mm | 2029 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gaz-System100%
Parent companies
In the news
Recent headlines that name Hermanowice-Jaroslaw Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Hermanowice-Jaroslaw Pipeline run?
- Hermanowice-Jaroslaw Pipeline is recorded in Poland. Global Energy Monitor reports no start and end points for it.
- How long is Hermanowice-Jaroslaw Pipeline?
- Hermanowice-Jaroslaw Pipeline is 39 km long.
- How much gas can Hermanowice-Jaroslaw Pipeline carry?
- No design capacity is reported for Hermanowice-Jaroslaw Pipeline. That is an absent figure, not a zero.
- Is Hermanowice-Jaroslaw Pipeline operating?
- Hermanowice-Jaroslaw Pipeline is proposed, with a reported start year of 2029.
- Who owns Hermanowice-Jaroslaw Pipeline?
- Hermanowice-Jaroslaw Pipeline is owned by Gaz-System, as recorded in the current tracker release.
More gas pipelines in Poland
Listed in name order among the 48 pipelines tracked in Poland, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.