Gas transmission pipeline · Hermanowice to Jarosław
Hermanowice-Jaroslaw Pipeline
Hermanowice-Jaroslaw Pipeline is a proposed gas transmission pipeline in Poland. The tracker lists 1 tracked segment, 39 km long, starting up in 2029. It runs from Hermanowice to Jarosław. It is owned by Gaz-System.
Length
39 km
Capacity
Not reported
Segments tracked
1
Largest diameter 700 mm (28 in)
Route
Hermanowice-Jaroslaw Pipeline runs from Hermanowice to Jarosław. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Hermanowice
- To
- Jarosław
- Start country
- Poland
- End country
- Poland
- Countries crossed
- Poland
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 34 km
- GEM pipeline ID
- P1349
- Start year
- 2029
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Hermanowice → Jarosław | 39 | Not reported | 700 mm | 2029 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gaz-System100%
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Hermanowice-Jaroslaw Pipeline run?
- Hermanowice-Jaroslaw Pipeline runs from Hermanowice to Jarosław, crossing Poland.
- How long is Hermanowice-Jaroslaw Pipeline?
- Hermanowice-Jaroslaw Pipeline is 39 km long.
- How much gas can Hermanowice-Jaroslaw Pipeline carry?
- No design capacity is reported for Hermanowice-Jaroslaw Pipeline. That is an absent figure, not a zero.
- Is Hermanowice-Jaroslaw Pipeline operating?
- Hermanowice-Jaroslaw Pipeline is proposed, with a reported start year of 2029.
- Who owns Hermanowice-Jaroslaw Pipeline?
- Hermanowice-Jaroslaw Pipeline is owned by Gaz-System, as recorded in the current tracker release.