LNG Chain

Gas transmission pipeline · Gdansk to Ploty

Goleniow–Gdynia Gas Pipeline

Goleniow–Gdynia Gas Pipeline is an operating gas transmission pipeline in Poland. The tracker lists 1 tracked segment, 278 km long. It runs from Gdansk to Ploty. It is owned by Gaz-System.

Length

278 km

Capacity

Not reported

Segments tracked

1

Route

Goleniow–Gdynia Gas Pipeline runs from Gdansk to Ploty. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Gdansk
To
Ploty
Start country
Poland
End country
Poland
Countries crossed
Poland
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
278 km
GEM pipeline ID
P2879
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingGdansk → Ploty278Not reportedGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Polish Baltic Sea Coast FSRUPolandImportUnder construction10.4 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Goleniow–Gdynia Gas Pipeline run?
Goleniow–Gdynia Gas Pipeline runs from Gdansk to Ploty, crossing Poland.
How long is Goleniow–Gdynia Gas Pipeline?
Goleniow–Gdynia Gas Pipeline is 278 km long.
How much gas can Goleniow–Gdynia Gas Pipeline carry?
No design capacity is reported for Goleniow–Gdynia Gas Pipeline. That is an absent figure, not a zero.
Is Goleniow–Gdynia Gas Pipeline operating?
Goleniow–Gdynia Gas Pipeline is operating.
Who owns Goleniow–Gdynia Gas Pipeline?
Goleniow–Gdynia Gas Pipeline is owned by Gaz-System, as recorded in the current tracker release.
Does Goleniow–Gdynia Gas Pipeline serve an LNG terminal?
Goleniow–Gdynia Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.