Gas Interconnection Poland-Lithuania is an operating gas transmission pipeline crossing Poland, Lithuania. The tracker lists 1 tracked segment, 0 km long, starting up in 2024.

Length

0 km

Capacity

Not reported

Segments tracked

1

Largest diameter 711 mm (28 in)

Route

Gas Interconnection Poland-Lithuania runs from Poland – Lithuania. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Vilnius County
Start country
Poland
End country
Lithuania
Countries crossed
Poland, Lithuania
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
432 km
GEM pipeline ID
P5988
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Capacity ExpansionOperating? → Vilnius County0Not reported711 mm2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Gas Interconnection Poland-Lithuania run?
Gas Interconnection Poland-Lithuania runs from Poland to Lithuania, crossing Poland and Lithuania.
How long is Gas Interconnection Poland-Lithuania?
No length is reported for Gas Interconnection Poland-Lithuania and no route geometry is available to measure one from.
How much gas can Gas Interconnection Poland-Lithuania carry?
No design capacity is reported for Gas Interconnection Poland-Lithuania. That is an absent figure, not a zero.
Is Gas Interconnection Poland-Lithuania operating?
Gas Interconnection Poland-Lithuania is operating, having started in 2024.
Who owns Gas Interconnection Poland-Lithuania?
Ownership of Gas Interconnection Poland-Lithuania is not reported in the current tracker release.

More gas pipelines in Poland