Gas transmission pipeline · Texas to Texas
Corpus Christi Pipeline
Corpus Christi Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 34 km long and 15.64 bcm/y of capacity, starting up in 2022. It runs from Texas to Texas. It is owned by Cheniere Energy.
Length
34 km
Capacity
15.6 bcm/y
11.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Corpus Christi Pipeline runs from Texas to Texas. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Texas
- To
- Texas
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 33 km
- GEM pipeline ID
- P2521
- Start year
- 2022
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Stage III Pipeline | Operating | Texas → Texas | 34 | 15.6 | 1067 mm | 2022 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Corpus Christi LNG Terminal | United States | Export | Operating | 0.6 km | route proximity |
| Ingleside Energy LNG Terminal | United States | Export | Cancelled | 6.8 km | route proximity |
| Vista Del Sol LNG Terminal | United States | Import | Cancelled | 7.6 km | route proximity |
| South Texas LNG Terminal | United States | Export | Cancelled | 14.9 km | route proximity |
| Coastal Bend LNG Terminal | United States | Export | Proposed | 16.2 km | route proximity |
| Harbor Island (Axis Midstream) Oil Terminal | United States | Export | Cancelled | 21.3 km | route proximity |
| Harbor Island (Lone Star) Oil Terminal | United States | Export | Cancelled | 22.5 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Cheniere Energy100%
Parent companies
- Cheniere Energy100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Corpus Christi Pipeline run?
- Corpus Christi Pipeline runs from Texas to Texas, crossing United States.
- How long is Corpus Christi Pipeline?
- Corpus Christi Pipeline is 34 km long.
- How much gas can Corpus Christi Pipeline carry?
- Corpus Christi Pipeline has a design capacity of 15.6 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Corpus Christi Pipeline operating?
- Corpus Christi Pipeline is operating, having started in 2022.
- Who owns Corpus Christi Pipeline?
- Corpus Christi Pipeline is owned by Cheniere Energy, as recorded in the current tracker release.
- Does Corpus Christi Pipeline serve an LNG terminal?
- Corpus Christi Pipeline passes within 25 km of 7 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.