Import terminal · Województwo, Poland
Świnoujście Polskie LNG Terminal
Świnoujście Polskie LNG Terminal is an operating LNG import terminal in Województwo, Poland. The tracker lists 3 tracked units with 6.1 Mtpa operating, the earliest starting in 2016. It is owned by Operator Gazociagow Przesylowych GAZ-SYSTEM SP zoo.
Operating
6.1 Mtpa
8.3 bcm/y · 3 units
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Operating | 3.7 | 5.03 | 2016 | 2006 | Not reported | Operator Gazociagow Przesylowych GAZ-SYSTEM SP zoo [100%] |
| Expansion | Operating | 0.9 | 1.22 | 2022 | 2017 | Not reported | Operator Gazociagow Przesylowych GAZ-SYSTEM SP zoo [100%] |
| Expansion 2 | Operating | 1.5 | 2.04 | 2024 | 2020 | Not reported | Operator Gazociagow Przesylowych GAZ-SYSTEM SP zoo [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Operating | 3 | 6.1 | 8.3 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Parent companies
Reported cost
Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.
| Unit | Status | Capacity | Estimated cost | Per tonne a year |
|---|---|---|---|---|
| Not reported | Operating | 3.7 Mtpa | $1.04 billion950,000,000 EUR as reported | $280 |
| Expansion | Operating | 0.9 Mtpa | $465 million427,000,000 EUR as reported | $517 |
Financing as GEM records it: €133 million (US$189.9 million) loan from the European Investment Bank; €75 million (US$94.7 million) loan from the European Bank for Reconstruction and Development; €311 million (US$377.46 million) equity investment by Gaz-System; €121.8 million (US$147.6 million) grant from the European Structural Funds and a €65.3 million (US$79.12 million) grant from the European Commission · A €130 million (US$157 million) grant from the European Regional Development Fund
A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.
Location
Świnoujście Polskie LNG Terminal at 53.9092° N, 14.2947° E, with 1 tracked gas pipeline passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 53.9092° N, 14.2947° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Swinoujscie–Goleniow Gas Pipeline | Operating | 60 km | — | 0 km | route proximity |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.
In the news
Recent headlines that name Świnoujście Polskie LNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Świnoujście Polskie LNG Terminal?
- Świnoujście Polskie LNG Terminal is an LNG import terminal in Województwo, Poland. It is made up of 3 tracked trains and phases.
- Is Świnoujście Polskie LNG Terminal operating?
- Świnoujście Polskie LNG Terminal is operating, with its first tracked train starting in 2016.
- How much LNG can Świnoujście Polskie LNG Terminal handle?
- Świnoujście Polskie LNG Terminal has 6.1 Mtpa operating, equivalent to 8.3 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
- Who owns Świnoujście Polskie LNG Terminal?
- Świnoujście Polskie LNG Terminal is owned by Operator Gazociagow Przesylowych GAZ-SYSTEM SP zoo, and operated by Operator Gazociagow Przesylowych GAZ-SYSTEM. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Świnoujście Polskie LNG Terminal pass?
- Cargoes from Świnoujście Polskie LNG Terminal would normally pass Strait of Gibraltar, Suez Canal, Bab el-Mandeb and Danish Straits. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Świnoujście Polskie LNG Terminal?
- 1 tracked gas pipeline passes within 25 km of Świnoujście Polskie LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.