Import terminal · Guangxi, China
Guangxi LNG Terminal
Guangxi LNG Terminal is an operating LNG import terminal in Guangxi, China. The tracker lists 3 tracked units with 6 Mtpa operating, 6 Mtpa under construction, the earliest starting in 2016. It is owned by National Pipe Network Group Beihai LNG Co Ltd and Guangxi Gas Group Co Ltd.
Operating
6 Mtpa
8.16 bcm/y · 2 units
Under construction
6 Mtpa
8.16 bcm/y · 1 unit
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Phase I | Operating | 3 | 4.08 | 2016 | — | Not reported | National Pipe Network Group Beihai LNG Co Ltd [100%] |
| Phase II | Operating | 3 | 4.08 | 2025 | 2018 | Not reported | National Pipe Network Group Beihai LNG Co Ltd [100%] |
| Phase III | Under construction | 6 | 8.16 | — | 2021 | Not reported | Guangxi Gas Group Co Ltd [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Operating | 2 | 6 | 8.16 |
| Under construction | 1 | 6 | 8.16 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
- Guangxi Gas Group Co Ltd100%(1/3 units)
- National Pipe Network Group Beihai LNG Co Ltd100%(2/3 units)
Parent companies
- Guangxi Gas Group Co Ltd100%(1/3 units)
- National Petroleum and Natural Gas Pipeline Network Group Co Ltd80%(2/3 units)
- Guangxi Beibu Gulf International Port Group Co Ltd20%(2/3 units)
Location
Guangxi LNG Terminal at 21.4490° N, 109.5317° E, with 42 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 21.4490° N, 109.5317° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Guangxi LNG Terminal Transport Pipeline | Operating | 684 km | 4 bcm/y | 0.1 km | route proximity |
| Guangxi LNG Terminal Transport Pipeline | Operating | 207 km | 3.3 bcm/y | 7.7 km | route proximity |
| Guangxi LNG Terminal Transport Pipeline | Proposed | 244 km | — | 7.8 km | route proximity |
| Chongqing-Guizhou-Guangxi Gas Pipeline | Proposed | 919 km | 12 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Operating | 141 km | 1.44 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Proposed | 92 km | 0.36 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Under construction | 83 km | 0.85 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Shelved | 100 km | 0.22 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Proposed | 106 km | 0.84 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Under construction | 162 km | 0.94 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Proposed | 148 km | 0.19 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Operating | 120 km | 0.45 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Under construction | 60 km | 0.59 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Operating | 114 km | 0.52 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Operating | 70 km | 0.21 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Operating | 28 km | 0.07 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Operating | 20 km | 0.85 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Operating | 8 km | — | — | name match |
| Guangxi Gas Pipeline Network | Operating | 9 km | 0.67 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Operating | 45 km | 0.42 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Proposed | 27 km | 0.29 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Shelved | 723 km | — | — | name match |
| Guangxi Gas Pipeline Network | Proposed | 61 km | 0.03 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Proposed | 40 km | — | — | name match |
| Guangxi Gas Pipeline Network | Proposed | 100 km | 0.17 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Proposed | 723 km | — | — | name match |
| Guangxi Gas Pipeline Network | Proposed | 30 km | 4 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Operating | 12 km | 1.76 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Proposed | 723 km | — | — | name match |
| Guangxi Gas Pipeline Network | Operating | 27 km | 0.37 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Operating | 31 km | 0.11 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Operating | 50 km | 0.44 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Cancelled | 63 km | 0.1 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Proposed | 33 km | 0.11 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Proposed | 29 km | 0.04 bcm/y | — | name match |
| Guangxi Gas Pipeline Network | Proposed | 97 km | — | — | name match |
| Guangxi Gas Pipeline Network | Under construction | 64 km | 0.3 bcm/y | — | name match |
| Guangxi LNG Terminal Transport Pipeline | Cancelled | 78 km | — | — | name match |
| Guangxi LNG Terminal Transport Pipeline | Operating | 29 km | — | — | name match |
| Guangxi LNG Terminal Transport Pipeline | Operating | 156 km | 2.5 bcm/y | — | name match |
| Guangxi LNG Terminal Transport Pipeline | Cancelled | 63 km | — | — | name match |
| Guangxi LNG Terminal Transport Pipeline | Under construction | 344 km | 1 bcm/y | — | name match |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
Cargoes reach north-east Asia from the Middle East, Australia, the United States and Russia, so exposure is spread.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.
In the news
Recent headlines that name Guangxi LNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Guangxi LNG Terminal?
- Guangxi LNG Terminal is an LNG import terminal in Guangxi, China. It is made up of 3 tracked trains and phases.
- Is Guangxi LNG Terminal operating?
- Guangxi LNG Terminal is operating, with its first tracked train starting in 2016.
- How much LNG can Guangxi LNG Terminal handle?
- Guangxi LNG Terminal has 6 Mtpa operating, 6 Mtpa under construction, equivalent to 8.16 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
- Who owns Guangxi LNG Terminal?
- Guangxi LNG Terminal is owned by Guangxi Gas Group Co Ltd and National Pipe Network Group Beihai LNG Co Ltd. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Guangxi LNG Terminal pass?
- Cargoes from Guangxi LNG Terminal would normally pass Strait of Malacca, Strait of Hormuz, Panama Canal, Lombok Strait and 1 other. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Guangxi LNG Terminal?
- 42 tracked gas pipelines pass within 25 km of Guangxi LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.