Import terminal · Tamil Nadu, India
Ennore LNG Terminal
Ennore LNG Terminal is an operating LNG import terminal in Tamil Nadu, India. The tracker lists 2 tracked units with 5 Mtpa operating, 5 Mtpa proposed, the earliest starting in 2019. Ownership is not reported.
Operating
5 Mtpa
6.8 bcm/y · 1 unit
Under construction
—
no units under construction
Proposed
5 Mtpa
6.8 bcm/y · 1 unit
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Operating | 5 | 6.8 | 2019 | — | Not reported | Not reported |
| Unit Expansion | Proposed | 5 | 6.8 | — | — | Not reported | Not reported |
Capacity by status
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Operators
Location
Ennore LNG Terminal at 13.2761° N, 80.3472° E, with 4 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 13.2761° N, 80.3472° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Ennore-Nellore Gas Pipeline | Shelved | 220 km | 13.14 bcm/y | 3.9 km | route proximity |
| Kakinada-Vijayawada-Nellore Gas Pipeline | Under construction | 667 km | 6.57 bcm/y | 3.9 km | route proximity |
| Kondalapalli-Tirupati Gas Pipeline | Cancelled | 450 km | 1.46 bcm/y | 3.9 km | route proximity |
| Ennore-Tuticorn-Bengalaru Gas Pipeline | Under construction | 1,431 km | 30.9 bcm/y | 7.3 km | route proximity |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Strait of Hormuz
- Bab el-Mandeb
- Suez Canal
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Ennore LNG Terminal?
- Ennore LNG Terminal is an LNG import terminal in Tamil Nadu, India. It is made up of 2 tracked trains and phases.
- Is Ennore LNG Terminal operating?
- Ennore LNG Terminal is operating, with its first tracked train starting in 2019.
- How much LNG can Ennore LNG Terminal handle?
- Ennore LNG Terminal has 5 Mtpa operating, 5 Mtpa proposed, equivalent to 6.8 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
- Who owns Ennore LNG Terminal?
- Ownership of Ennore LNG Terminal is not reported in the current tracker release. It is operated by Indian Oil LNG, which is a different thing: the operator runs the facility and need not hold any share of it.
- Which maritime chokepoints do cargoes from Ennore LNG Terminal pass?
- Cargoes from Ennore LNG Terminal would normally pass Strait of Hormuz, Bab el-Mandeb and Suez Canal. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Ennore LNG Terminal?
- 4 tracked gas pipelines pass within 25 km of Ennore LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.