Import terminal · Province of Murcia, Spain
Cartagena LNG Terminal (Spain)
Cartagena LNG Terminal (Spain) is an operating LNG import terminal in Province of Murcia, Spain. The tracker lists 1 tracked unit with 8.7 Mtpa operating, the earliest starting in 1989. It is owned by Enagás SA.
Operating
8.7 Mtpa
11.8 bcm/y · 1 unit
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Operating | 8.7 | 11.8 | 1989 | — | Not reported | Enagás SA [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Operating | 1 | 8.7 | 11.8 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Location
Cartagena LNG Terminal (Spain) at 37.5746° N, 0.9595° W, with 3 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 37.5746° N, 0.9595° W
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Eje Levante Gas Pipeline | Operating | 62 km | — | 6.2 km | route proximity |
| Eje Levante Gas Pipeline | Operating | 79 km | — | 6.2 km | route proximity |
| Eje Levante Gas Pipeline | Operating | 368 km | — | 6.5 km | route proximity |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.
In the news
Recent headlines that name Cartagena LNG Terminal (Spain). Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Cartagena LNG Terminal (Spain)?
- Cartagena LNG Terminal (Spain) is an LNG import terminal in Province of Murcia, Spain. It is made up of 1 tracked train or phase.
- Is Cartagena LNG Terminal (Spain) operating?
- Cartagena LNG Terminal (Spain) is operating, with its first tracked train starting in 1989.
- How much LNG can Cartagena LNG Terminal (Spain) handle?
- Cartagena LNG Terminal (Spain) has 8.7 Mtpa operating, equivalent to 11.8 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
- Who owns Cartagena LNG Terminal (Spain)?
- Cartagena LNG Terminal (Spain) is owned by Enagás SA, and operated by Enagás SA. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from Cartagena LNG Terminal (Spain) pass?
- Cargoes from Cartagena LNG Terminal (Spain) would normally pass Strait of Gibraltar, Suez Canal, Bab el-Mandeb and Danish Straits. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to Cartagena LNG Terminal (Spain)?
- 3 tracked gas pipelines pass within 25 km of Cartagena LNG Terminal (Spain). Proximity is not proof of a physical connection; each match is listed with its distance.
In our rankings
Where this appears in the site's generated top lists. Each ranking page states its own method before its table.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.