Gas transmission pipeline · Spain
Eje Levante Gas Pipeline
Eje Levante Gas Pipeline is an operating gas transmission pipeline in Spain. The tracker lists 1 tracked segment, 368 km long, starting up in 1996. It is owned by Enagás SA.
Length
368 km
Capacity
Not reported
Segments tracked
1
Largest diameter 1016 mm (40 in)
Route
Eje Levante Gas Pipeline runs from Spain. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Spain
- Start country
- Spain
- End country
- Spain
- Countries crossed
- Spain
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 311 km
- GEM pipeline ID
- P1578
- Start year
- 1996
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Main segment | Operating | ? → Spain | 368 | Not reported | 1016 mm | 1996 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Cartagena LNG Terminal (Spain) | Spain | Import | Operating | 6.5 km | route proximity |
| Sagunto LNG Terminal | Spain | Import | Operating | 12.8 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Eje Levante Gas Pipeline run?
- Eje Levante Gas Pipeline is recorded in Spain. Global Energy Monitor reports no start and end points for it.
- How long is Eje Levante Gas Pipeline?
- Eje Levante Gas Pipeline is 368 km long.
- How much gas can Eje Levante Gas Pipeline carry?
- No design capacity is reported for Eje Levante Gas Pipeline. That is an absent figure, not a zero.
- Is Eje Levante Gas Pipeline operating?
- Eje Levante Gas Pipeline is operating, having started in 1996.
- Who owns Eje Levante Gas Pipeline?
- Eje Levante Gas Pipeline is owned by Enagás SA, as recorded in the current tracker release.
- Does Eje Levante Gas Pipeline serve an LNG terminal?
- Eje Levante Gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.