LNG Atlas

Import terminal · Nador, Morocco

Nador FSRU

Nador FSRU is a proposed LNG import terminal (floating storage and regasification unit (FSRU)) in Nador, Morocco. The tracker lists 1 tracked unit; capacity is not reported. Ownership is not reported.

Operating

—

no units operating

Under construction

—

no units under construction

Proposed

Not reported

1 unit, capacity not reported

At a glance

Country
Morocco
State / province
Nador
Region
Africa
Import / export
Import
Onshore / floating
FSRU
Status (rolled up)
Proposed
Trains / phases tracked
1
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
35.2550° N, 3.1778° W
GEM terminal ID
T100000131161
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Not reportedProposedNot reportedNot reported—2024Not reportedunknown

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Ownership is not reported for this terminal.

Location

Nador FSRU at 35.2550° N, 3.1778° W.

Loads about 250 kB of map code and the country outline file.

Coordinates
35.2550° N, 3.1778° W
Coordinate accuracy (GEM)
approximate
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

No tracked gas pipeline passes within 25 km of this terminal in the current release.

Supplied via

Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.

Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.

Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Nador FSRU?
Nador FSRU is an LNG import terminal in Nador, Morocco. It is made up of 1 tracked train or phase.
Is Nador FSRU operating?
Nador FSRU is proposed. Nothing here should be read as a forecast that it will be built.
How much LNG can Nador FSRU handle?
Global Energy Monitor reports no capacity for Nador FSRU, so none is shown. That is an absent figure, not a zero.
Who owns Nador FSRU?
Neither ownership nor an operator is reported for Nador FSRU in the current tracker release.
Which maritime chokepoints do cargoes from Nador FSRU pass?
Cargoes from Nador FSRU would normally pass Strait of Gibraltar, Suez Canal, Bab el-Mandeb and Danish Straits. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail