Gas transmission pipeline · Almaty Region to Almaty Region
Taldykorgan-Usharal Gas Pipeline
Taldykorgan-Usharal Gas Pipeline is an under construction gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 302 km long and 0.39 bcm/y of capacity, starting up in 2025. It runs from Almaty Region to Almaty Region. It is owned by QazaqGaz.
Length
302 km
Capacity
0.39 bcm/y
0.3 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 13462 mm (530 in)
Route
Taldykorgan-Usharal Gas Pipeline runs from Almaty Region to Almaty Region. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Almaty Region
- To
- Almaty Region
- Start country
- Kazakhstan
- End country
- Kazakhstan
- Countries crossed
- Kazakhstan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 300 km
- GEM pipeline ID
- P5901
- Start year
- 2025
- Estimated cost (GEM, US dollars)
- $303 million
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Under construction | Almaty Region → Almaty Region | 302 | 0.39 | 13462 mm | 2025 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- QazaqGaz100%
Parent companies
In the news
Recent headlines that name Taldykorgan-Usharal Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Taldykorgan-Usharal Gas Pipeline run?
- Taldykorgan-Usharal Gas Pipeline runs from Almaty Region to Almaty Region, crossing Kazakhstan.
- How long is Taldykorgan-Usharal Gas Pipeline?
- Taldykorgan-Usharal Gas Pipeline is 302 km long.
- How much gas can Taldykorgan-Usharal Gas Pipeline carry?
- Taldykorgan-Usharal Gas Pipeline has a design capacity of 0.39 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Taldykorgan-Usharal Gas Pipeline operating?
- Taldykorgan-Usharal Gas Pipeline is under construction, with a reported start year of 2025.
- Who owns Taldykorgan-Usharal Gas Pipeline?
- Taldykorgan-Usharal Gas Pipeline is owned by QazaqGaz, as recorded in the current tracker release.
More gas pipelines in Kazakhstan
Listed in name order among the 37 pipelines tracked in Kazakhstan, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Tengiz-Kulsary Gas PipelineAtyrau to Atyrau · 126 km
- Zhanaozen-Zhetybay-Aktau Gas PipelineMangistau to Mangistau · 149 km
- Zhanaozen-Zhetybay-Aktau Gas PipelineMangistau to Mangistau · 18 km
- Saryarka Gas Pipeline0 km
- Sarybulak-Zimunay Gas PipelineEast Kazakhstan to Xinjiang · 93 km
- Shagyrly-Shomyshty - Beineu Gas PiplelineMangystau to Mangystau · 96 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.