LNG Atlas

Gas transmission pipeline · Kazakhstan

Saryarka Gas Pipeline

Saryarka Gas Pipeline is a proposed gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 0 km long and 7.8 bcm/y of capacity, starting up in 2027. It is owned by AstanaGaz KMG JSC.

Length

0 km

Capacity

7.8 bcm/y

5.7 Mtpa LNG equivalent

Segments tracked

1

Route

Saryarka Gas Pipeline runs from Kazakhstan. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Kyzylorda Region
To
Not reported
Start country
Kazakhstan
End country
Kazakhstan
Countries crossed
Kazakhstan
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
1,538 km
GEM pipeline ID
P3309
Start year
2027
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Phase IV (Capacity expansion)ProposedKyzylorda Region → ?07.8—2027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Saryarka Gas Pipeline run?
Saryarka Gas Pipeline is recorded in Kazakhstan. Global Energy Monitor reports no start and end points for it.
How long is Saryarka Gas Pipeline?
No length is reported for Saryarka Gas Pipeline and no route geometry is available to measure one from.
How much gas can Saryarka Gas Pipeline carry?
Saryarka Gas Pipeline has a design capacity of 7.8 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Saryarka Gas Pipeline operating?
Saryarka Gas Pipeline is proposed, with a reported start year of 2027.
Who owns Saryarka Gas Pipeline?
Saryarka Gas Pipeline is owned by AstanaGaz KMG JSC, as recorded in the current tracker release.

More gas pipelines in Kazakhstan

Listed in name order among the 37 pipelines tracked in Kazakhstan, so projects with the same name sit together. A browse aid, not a claim that they are alike.