Gas transmission pipeline · Kazakhstan
Saryarka Gas Pipeline
Saryarka Gas Pipeline is a proposed gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 0 km long and 7.8 bcm/y of capacity, starting up in 2027. It is owned by AstanaGaz KMG JSC.
Length
0 km
Capacity
7.8 bcm/y
5.7 Mtpa LNG equivalent
Segments tracked
1
Route
Saryarka Gas Pipeline runs from Kazakhstan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Kyzylorda Region
- To
- Not reported
- Start country
- Kazakhstan
- End country
- Kazakhstan
- Countries crossed
- Kazakhstan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 1,538 km
- GEM pipeline ID
- P3309
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Phase IV (Capacity expansion) | Proposed | Kyzylorda Region → ? | 0 | 7.8 | — | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name Saryarka Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Saryarka Gas Pipeline run?
- Saryarka Gas Pipeline is recorded in Kazakhstan. Global Energy Monitor reports no start and end points for it.
- How long is Saryarka Gas Pipeline?
- No length is reported for Saryarka Gas Pipeline and no route geometry is available to measure one from.
- How much gas can Saryarka Gas Pipeline carry?
- Saryarka Gas Pipeline has a design capacity of 7.8 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Saryarka Gas Pipeline operating?
- Saryarka Gas Pipeline is proposed, with a reported start year of 2027.
- Who owns Saryarka Gas Pipeline?
- Saryarka Gas Pipeline is owned by AstanaGaz KMG JSC, as recorded in the current tracker release.
More gas pipelines in Kazakhstan
Listed in name order among the 37 pipelines tracked in Kazakhstan, so projects with the same name sit together. A browse aid, not a claim that they are alike.