Gas transmission pipeline · Mangistau to Mangistau
Zhanaozen-Zhetybay-Aktau Gas Pipeline
Zhanaozen-Zhetybay-Aktau Gas Pipeline is an operating gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 18 km long and 4.54 bcm/y of capacity, starting up in 1974. It runs from Mangistau to Mangistau. It is owned by QazaqGaz.
Length
18 km
Capacity
4.54 bcm/y
3.3 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 18288 mm (720 in)
Route
Zhanaozen-Zhetybay-Aktau Gas Pipeline runs from Mangistau to Mangistau. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Mangistau
- To
- Mangistau
- Start country
- Kazakhstan
- End country
- Kazakhstan
- Countries crossed
- Kazakhstan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 469 km
- GEM pipeline ID
- P5776
- Start year
- 1974
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| II Kaz GPP-KS - Zhanaozen | Operating | Mangistau → Mangistau | 18 | 4.54 | 18288 mm | 1974 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- QazaqGaz100%
Parent companies
In the news
Recent headlines that name Zhanaozen-Zhetybay-Aktau Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Zhanaozen-Zhetybay-Aktau Gas Pipeline run?
- Zhanaozen-Zhetybay-Aktau Gas Pipeline runs from Mangistau to Mangistau, crossing Kazakhstan.
- How long is Zhanaozen-Zhetybay-Aktau Gas Pipeline?
- Zhanaozen-Zhetybay-Aktau Gas Pipeline is 18 km long.
- How much gas can Zhanaozen-Zhetybay-Aktau Gas Pipeline carry?
- Zhanaozen-Zhetybay-Aktau Gas Pipeline has a design capacity of 4.54 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Zhanaozen-Zhetybay-Aktau Gas Pipeline operating?
- Zhanaozen-Zhetybay-Aktau Gas Pipeline is operating, having started in 1974.
- Who owns Zhanaozen-Zhetybay-Aktau Gas Pipeline?
- Zhanaozen-Zhetybay-Aktau Gas Pipeline is owned by QazaqGaz, as recorded in the current tracker release.
More gas pipelines in Kazakhstan
Listed in name order among the 37 pipelines tracked in Kazakhstan, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Zhanaozen-Zhetybay-Aktau Gas PipelineMangistau to Mangistau · 61 km
- Zhanaozen-Zhetybay-Aktau Gas PipelineMangistau to Mangistau · 71 km
- Zhanaozen-Zhetybay-Aktau Gas PipelineMangistau to Mangistau · 138 km
- Taldykorgan-Usharal Gas PipelineAlmaty Region to Almaty Region · 302 km
- Tengiz-Kulsary Gas PipelineAtyrau to Atyrau · 126 km
- Zhanaozen-Zhetybay-Aktau Gas PipelineMangistau to Mangistau · 149 km