Gas transmission pipeline · Mangystau to Mangystau
Shagyrly-Shomyshty - Beineu Gas Pipleline
Shagyrly-Shomyshty - Beineu Gas Pipleline is an operating gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 96 km long and 1.56 bcm/y of capacity, starting up in 2015. It runs from Mangystau to Mangystau. It is owned by KazAzot JSC.
Length
96 km
Capacity
1.56 bcm/y
1.1 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 13462 mm (530 in)
Route
Shagyrly-Shomyshty - Beineu Gas Pipleline runs from Mangystau to Mangystau. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Mangystau
- To
- Mangystau
- Start country
- Kazakhstan
- End country
- Kazakhstan
- Countries crossed
- Kazakhstan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 106 km
- GEM pipeline ID
- P6789
- Start year
- 2015
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Mangystau → Mangystau | 96 | 1.56 | 13462 mm | 2015 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- KazAzot JSC100%
Parent companies
- KazAzot JSC100%
In the news
Recent headlines that name Shagyrly-Shomyshty - Beineu Gas Pipleline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Shagyrly-Shomyshty - Beineu Gas Pipleline run?
- Shagyrly-Shomyshty - Beineu Gas Pipleline runs from Mangystau to Mangystau, crossing Kazakhstan.
- How long is Shagyrly-Shomyshty - Beineu Gas Pipleline?
- Shagyrly-Shomyshty - Beineu Gas Pipleline is 96 km long.
- How much gas can Shagyrly-Shomyshty - Beineu Gas Pipleline carry?
- Shagyrly-Shomyshty - Beineu Gas Pipleline has a design capacity of 1.56 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Shagyrly-Shomyshty - Beineu Gas Pipleline operating?
- Shagyrly-Shomyshty - Beineu Gas Pipleline is operating, having started in 2015.
- Who owns Shagyrly-Shomyshty - Beineu Gas Pipleline?
- Shagyrly-Shomyshty - Beineu Gas Pipleline is owned by KazAzot JSC, as recorded in the current tracker release.
More gas pipelines in Kazakhstan
Listed in name order among the 37 pipelines tracked in Kazakhstan, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Taldykorgan-Usharal Gas PipelineAlmaty Region to Almaty Region · 302 km
- Tengiz-Kulsary Gas PipelineAtyrau to Atyrau · 126 km
- Zhanaozen-Zhetybay-Aktau Gas PipelineMangistau to Mangistau · 149 km
- Saryarka Gas Pipeline177 km
- Saryarka Gas Pipeline0 km
- Sarybulak-Zimunay Gas PipelineEast Kazakhstan to Xinjiang · 93 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.