Gas transmission pipeline · Kokshetau to Petropavl
Saryarka Gas Pipeline
Saryarka Gas Pipeline is a proposed gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 177 km long, starting up in 2028. It runs from Kokshetau to Petropavl. It is owned by AstanaGaz KMG JSC.
Length
177 km
Capacity
Not reported
Segments tracked
1
Largest diameter 426 mm (17 in)
Route
Saryarka Gas Pipeline runs from Kokshetau to Petropavl. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Kokshetau
- To
- Petropavl
- Start country
- Kazakhstan
- End country
- Kazakhstan
- Countries crossed
- Kazakhstan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 177 km
- GEM pipeline ID
- P3308
- Start year
- 2028
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Phase III (Kokshetau-Petropavlovsk Gas Pipeline) | Proposed | Kokshetau → Petropavl | 177 | Not reported | 426 mm | 2028 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Saryarka Gas Pipeline run?
- Saryarka Gas Pipeline runs from Kokshetau to Petropavl, crossing Kazakhstan.
- How long is Saryarka Gas Pipeline?
- Saryarka Gas Pipeline is 177 km long.
- How much gas can Saryarka Gas Pipeline carry?
- No design capacity is reported for Saryarka Gas Pipeline. That is an absent figure, not a zero.
- Is Saryarka Gas Pipeline operating?
- Saryarka Gas Pipeline is proposed, with a reported start year of 2028.
- Who owns Saryarka Gas Pipeline?
- Saryarka Gas Pipeline is owned by AstanaGaz KMG JSC, as recorded in the current tracker release.