Gas transmission pipeline · Kazakhstan

Saryarka Gas Pipeline

Saryarka Gas Pipeline is a proposed gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 276 km long and 2.2 bcm/y of capacity, starting up in 2025. It is owned by AstanaGaz KMG JSC.

Length

276 km

Capacity

2.2 bcm/y

1.6 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 16002 mm (630 in)

Route

Saryarka Gas Pipeline runs from Kazakhstan. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Kazakhstan
End country
Kazakhstan
Countries crossed
Kazakhstan
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
333 km
GEM pipeline ID
P3307
Start year
2025
Estimated cost (GEM, US dollars)
$111 million
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Phase II (Astana-Kokshetau Gas Pipeline)ProposedNot reported2762.216002 mm2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Saryarka Gas Pipeline run?
Saryarka Gas Pipeline is recorded in Kazakhstan. Global Energy Monitor reports no start and end points for it.
How long is Saryarka Gas Pipeline?
Saryarka Gas Pipeline is 276 km long.
How much gas can Saryarka Gas Pipeline carry?
Saryarka Gas Pipeline has a design capacity of 2.2 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Saryarka Gas Pipeline operating?
Saryarka Gas Pipeline is proposed, with a reported start year of 2025.
Who owns Saryarka Gas Pipeline?
Saryarka Gas Pipeline is owned by AstanaGaz KMG JSC, as recorded in the current tracker release.

More gas pipelines in Kazakhstan

Listed in name order among the 37 pipelines tracked in Kazakhstan, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail