Gas transmission pipeline · Kazakhstan
Saryarka Gas Pipeline
Saryarka Gas Pipeline is a proposed gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 276 km long and 2.2 bcm/y of capacity, starting up in 2025. It is owned by AstanaGaz KMG JSC.
Length
276 km
Capacity
2.2 bcm/y
1.6 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 16002 mm (630 in)
Route
Saryarka Gas Pipeline runs from Kazakhstan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Kazakhstan
- End country
- Kazakhstan
- Countries crossed
- Kazakhstan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 333 km
- GEM pipeline ID
- P3307
- Start year
- 2025
- Estimated cost (GEM, US dollars)
- $111 million
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Phase II (Astana-Kokshetau Gas Pipeline) | Proposed | Not reported | 276 | 2.2 | 16002 mm | 2025 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name Saryarka Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Saryarka Gas Pipeline run?
- Saryarka Gas Pipeline is recorded in Kazakhstan. Global Energy Monitor reports no start and end points for it.
- How long is Saryarka Gas Pipeline?
- Saryarka Gas Pipeline is 276 km long.
- How much gas can Saryarka Gas Pipeline carry?
- Saryarka Gas Pipeline has a design capacity of 2.2 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Saryarka Gas Pipeline operating?
- Saryarka Gas Pipeline is proposed, with a reported start year of 2025.
- Who owns Saryarka Gas Pipeline?
- Saryarka Gas Pipeline is owned by AstanaGaz KMG JSC, as recorded in the current tracker release.
More gas pipelines in Kazakhstan
Listed in name order among the 37 pipelines tracked in Kazakhstan, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.