Gas transmission pipeline · Bernalda to Palagiano
Palagiano–Bernalda Gas Pipeline
Palagiano–Bernalda Gas Pipeline is an operating gas transmission pipeline in Italy. The tracker lists 1 tracked segment, 33 km long, starting up in 1975. It runs from Bernalda to Palagiano. It is owned by Snam Rete Gas SpA.
Length
33 km
Capacity
Not reported
Segments tracked
1
Largest diameter 508 mm (20 in)
Route
Palagiano–Bernalda Gas Pipeline runs from Bernalda to Palagiano. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Bernalda
- To
- Palagiano
- Start country
- Italy
- End country
- Italy
- Countries crossed
- Italy
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 30 km
- GEM pipeline ID
- P2988
- Start year
- 1975
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Bernalda → Palagiano | 33 | Not reported | 508 mm | 1975 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Taranto LNG Terminal | Italy | Import | Proposed | 18.3 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- Snam SpA100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Palagiano–Bernalda Gas Pipeline run?
- Palagiano–Bernalda Gas Pipeline runs from Bernalda to Palagiano, crossing Italy.
- How long is Palagiano–Bernalda Gas Pipeline?
- Palagiano–Bernalda Gas Pipeline is 33 km long.
- How much gas can Palagiano–Bernalda Gas Pipeline carry?
- No design capacity is reported for Palagiano–Bernalda Gas Pipeline. That is an absent figure, not a zero.
- Is Palagiano–Bernalda Gas Pipeline operating?
- Palagiano–Bernalda Gas Pipeline is operating, having started in 1975.
- Who owns Palagiano–Bernalda Gas Pipeline?
- Palagiano–Bernalda Gas Pipeline is owned by Snam Rete Gas SpA, as recorded in the current tracker release.
- Does Palagiano–Bernalda Gas Pipeline serve an LNG terminal?
- Palagiano–Bernalda Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.