Gas transmission pipeline · Italy

Methanization of Sardinia Project

Methanization of Sardinia Project is a proposed gas transmission pipeline in Italy. The tracker lists 1 tracked segment, 420 km long and 1.68 bcm/y of capacity, starting up in 2027. It is owned by ENURA SpA.

Length

420 km

Capacity

1.68 bcm/y

1.2 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 254 mm (10 in)

Route

Methanization of Sardinia Project runs from Italy. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Italy
End country
Italy
Countries crossed
Italy
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
560 km
GEM pipeline ID
P2235
Start year
2027
Estimated cost (GEM, US dollars)
$654 million
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Phase 1ProposedNot reported4201.68254 mm2027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
HIGAS LNG TerminalItalyImportOperating1.8 kmroute proximity
Portovesme FSRUItalyImportShelved6 kmroute proximity
Porto Torres FSRUItalyImportShelved7.2 kmroute proximity
Cambodia LNG ProjectCambodiaImportCancelled—name match
Filipinas LNG Gateway Project FSRUPhilippinesImportUnder construction—name match
PAWA PNG FSRU ProjectPapua New GuineaImportShelved—name match
Project Venezuela LNG TerminalVenezuelaExportCancelled—name match
Yakutia LNG ProjectRussiaExportProposed—name match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Methanization of Sardinia Project run?
Methanization of Sardinia Project is recorded in Italy. Global Energy Monitor reports no start and end points for it.
How long is Methanization of Sardinia Project?
Methanization of Sardinia Project is 420 km long.
How much gas can Methanization of Sardinia Project carry?
Methanization of Sardinia Project has a design capacity of 1.68 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Methanization of Sardinia Project operating?
Methanization of Sardinia Project is proposed, with a reported start year of 2027.
Who owns Methanization of Sardinia Project?
Methanization of Sardinia Project is owned by ENURA SpA, as recorded in the current tracker release.
Does Methanization of Sardinia Project serve an LNG terminal?
Methanization of Sardinia Project passes within 25 km of 8 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Italy

Listed in name order among the 142 pipelines tracked in Italy, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail