Gas transmission pipeline · Gazimammad to Abadan
Hajiqabul–Astara–Abadan Gas Pipeline
Hajiqabul–Astara–Abadan Gas Pipeline is an operating gas transmission pipeline crossing Azerbaijan, Iran. The tracker lists 1 tracked segment, 1,475 km long and 10 bcm/y of capacity, starting up in 1970. It runs from Gazimammad to Abadan. It is owned by National Iranian Oil Refining and Distribution Co and SOCAR.
Length
1,475 km
Capacity
10 bcm/y
7.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1020 mm (40 in)
Route
Hajiqabul–Astara–Abadan Gas Pipeline runs from Gazimammad to Abadan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Gazimammad
- To
- Abadan
- Start country
- Azerbaijan
- End country
- Iran
- Countries crossed
- Azerbaijan, Iran
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 1,292 km
- GEM pipeline ID
- P0748
- Start year
- 1970
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Gazimammad → Abadan | 1,475 | 10 | 1020 mm | 1970 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Hajiqabul–Astara–Abadan Gas Pipeline run?
- Hajiqabul–Astara–Abadan Gas Pipeline runs from Gazimammad to Abadan, crossing Azerbaijan and Iran.
- How long is Hajiqabul–Astara–Abadan Gas Pipeline?
- Hajiqabul–Astara–Abadan Gas Pipeline is 1,475 km long.
- How much gas can Hajiqabul–Astara–Abadan Gas Pipeline carry?
- Hajiqabul–Astara–Abadan Gas Pipeline has a design capacity of 10 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Hajiqabul–Astara–Abadan Gas Pipeline operating?
- Hajiqabul–Astara–Abadan Gas Pipeline is operating, having started in 1970.
- Who owns Hajiqabul–Astara–Abadan Gas Pipeline?
- Hajiqabul–Astara–Abadan Gas Pipeline is owned by National Iranian Oil Refining and Distribution Co and SOCAR, as recorded in the current tracker release.