Gas transmission pipeline · Azerbaijan – Georgia
Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI)
Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI) is a cancelled gas transmission pipeline crossing Azerbaijan, Georgia. The tracker lists 1 tracked segment, 920 km long and 8 bcm/y of capacity, starting up in 2027. Owners include SNGN RomGaz SA, Government of Azerbaijan, Georgian Oil and Gas Corp and 1 more.
Length
920 km
Capacity
8 bcm/y
5.9 Mtpa LNG equivalent
Segments tracked
1
Route
Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI) runs from Azerbaijan – Georgia. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Azerbaijan
- End country
- Georgia
- Countries crossed
- Azerbaijan, Georgia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 692 km
- GEM pipeline ID
- P0735
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Not reported | 920 | 8 | — | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Kulevi LNG Terminal | Georgia | Import | Cancelled | 1.2 km | route proximity |
| Black Sea LNG Terminal | Romania | Export | Proposed | 1.8 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
In the news
Recent headlines that name Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI). Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI) run?
- Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI) runs from Azerbaijan to Georgia, crossing Azerbaijan and Georgia.
- How long is Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI)?
- Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI) is 920 km long.
- How much gas can Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI) carry?
- Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI) has a design capacity of 8 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI) operating?
- Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI) is cancelled, with a reported start year of 2027.
- Who owns Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI)?
- Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI) is owned by Georgian Oil and Gas Corp, Government of Azerbaijan, MVM Group and 1 other, as recorded in the current tracker release.
- Does Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI) serve an LNG terminal?
- Azerbaijan-Georgia-Romania Interconnector Gas Pipeline (AGRI) passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Azerbaijan
Listed in name order among the 8 pipelines tracked in Azerbaijan, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.