Gas transmission pipeline · Hajigabul to Saguramo
Hajigabul-Gazakh-Saguramo Pipeline
Hajigabul-Gazakh-Saguramo Pipeline is an operating gas transmission pipeline crossing Azerbaijan, Georgia. The tracker lists 1 tracked segment, 478 km long and 8.7 bcm/y of capacity, starting up in 2006. It runs from Hajigabul to Saguramo. It is owned by SOCAR and Georgian Oil and Gas Corp.
Length
478 km
Capacity
8.7 bcm/y
6.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1000 mm (39 in)
Route
Hajigabul-Gazakh-Saguramo Pipeline runs from Hajigabul to Saguramo. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Hajigabul
- To
- Saguramo
- Start country
- Azerbaijan
- End country
- Georgia
- Countries crossed
- Azerbaijan, Georgia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 456 km
- GEM pipeline ID
- P4211
- Start year
- 2006
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Hajigabul → Saguramo | 478 | 8.7 | 1000 mm | 2006 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Hajigabul-Gazakh-Saguramo Pipeline run?
- Hajigabul-Gazakh-Saguramo Pipeline runs from Hajigabul to Saguramo, crossing Azerbaijan and Georgia.
- How long is Hajigabul-Gazakh-Saguramo Pipeline?
- Hajigabul-Gazakh-Saguramo Pipeline is 478 km long.
- How much gas can Hajigabul-Gazakh-Saguramo Pipeline carry?
- Hajigabul-Gazakh-Saguramo Pipeline has a design capacity of 8.7 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Hajigabul-Gazakh-Saguramo Pipeline operating?
- Hajigabul-Gazakh-Saguramo Pipeline is operating, having started in 2006.
- Who owns Hajigabul-Gazakh-Saguramo Pipeline?
- Hajigabul-Gazakh-Saguramo Pipeline is owned by Georgian Oil and Gas Corp and SOCAR, as recorded in the current tracker release.