Gas transmission pipeline · Cordoba to Campo Major

Cordoba–Campo Major Pipeline

Cordoba–Campo Major Pipeline is an operating gas transmission pipeline in Spain. The tracker lists 1 tracked segment, 251 km long, starting up in 1996. It runs from Cordoba to Campo Major.

Length

251 km

Capacity

Not reported

Segments tracked

1

Largest diameter 813 mm (32 in)

Route

Cordoba–Campo Major Pipeline runs from Cordoba to Campo Major. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Cordoba
To
Campo Major
Start country
Spain
End country
Portugal
Countries crossed
Spain
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
242 km
GEM pipeline ID
P1656
Start year
1996
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingCordoba → Campo Major251Not reported813 mm1996GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Cordoba–Campo Major Pipeline run?
Cordoba–Campo Major Pipeline runs from Cordoba to Campo Major, crossing Spain.
How long is Cordoba–Campo Major Pipeline?
Cordoba–Campo Major Pipeline is 251 km long.
How much gas can Cordoba–Campo Major Pipeline carry?
No design capacity is reported for Cordoba–Campo Major Pipeline. That is an absent figure, not a zero.
Is Cordoba–Campo Major Pipeline operating?
Cordoba–Campo Major Pipeline is operating, having started in 1996.
Who owns Cordoba–Campo Major Pipeline?
Ownership of Cordoba–Campo Major Pipeline is not reported in the current tracker release.