Gas transmission pipeline · Paterna to Castellon de la Plana
Eje Levante Gas Pipeline
Eje Levante Gas Pipeline is an operating gas transmission pipeline in Spain. The tracker lists 1 tracked segment, 158 km long, starting up in 2006. It runs from Paterna to Castellon de la Plana. It is owned by Enagás SA.
Length
158 km
Capacity
Not reported
Segments tracked
1
Largest diameter 508 mm (20 in)
Route
Eje Levante Gas Pipeline runs from Paterna to Castellon de la Plana. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Paterna
- To
- Castellon de la Plana
- Start country
- Spain
- End country
- Spain
- Countries crossed
- Spain
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 158 km
- GEM pipeline ID
- P4198
- Start year
- 2006
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Paterna-Teruel-Castillon | Operating | Paterna → Castellon de la Plana | 158 | Not reported | 508 mm | 2006 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Sagunto LNG Terminal | Spain | Import | Operating | 15.4 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Eje Levante Gas Pipeline run?
- Eje Levante Gas Pipeline runs from Paterna to Castellon de la Plana, crossing Spain.
- How long is Eje Levante Gas Pipeline?
- Eje Levante Gas Pipeline is 158 km long.
- How much gas can Eje Levante Gas Pipeline carry?
- No design capacity is reported for Eje Levante Gas Pipeline. That is an absent figure, not a zero.
- Is Eje Levante Gas Pipeline operating?
- Eje Levante Gas Pipeline is operating, having started in 2006.
- Who owns Eje Levante Gas Pipeline?
- Eje Levante Gas Pipeline is owned by Enagás SA, as recorded in the current tracker release.
- Does Eje Levante Gas Pipeline serve an LNG terminal?
- Eje Levante Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.