East Java Gas Pipeline (EJGP)

East Java Gas Pipeline (EJGP) is an operating gas transmission pipeline in Indonesia. The tracker lists 1 tracked segment, 495 km long and 6.13 bcm/y of capacity, starting up in 1993. It is owned by PT Pertamina Gas.

Length

495 km

Capacity

6.13 bcm/y

4.5 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 711 mm (28 in)

Route

East Java Gas Pipeline (EJGP) runs from Indonesia. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Indonesia
End country
Indonesia
Countries crossed
Indonesia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
471 km
GEM pipeline ID
P0966
Start year
1993
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingNot reported4956.13711 mm1993GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Teluk Lamong LNG TerminalIndonesiaImportUnder construction3.6 kmroute proximity
Australasia Probolinggo FSRUIndonesiaImportCancelled6.2 kmroute proximity
Gresik LNG TerminalIndonesiaImportProposed14.2 kmroute proximity
Woodside Probolinggo LNG TerminalIndonesiaImportCancelled16.5 kmroute proximity
Madura FLNG TerminalIndonesiaExportShelved21.7 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does East Java Gas Pipeline (EJGP) run?
East Java Gas Pipeline (EJGP) is recorded in Indonesia. Global Energy Monitor reports no start and end points for it.
How long is East Java Gas Pipeline (EJGP)?
East Java Gas Pipeline (EJGP) is 495 km long.
How much gas can East Java Gas Pipeline (EJGP) carry?
East Java Gas Pipeline (EJGP) has a design capacity of 6.13 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is East Java Gas Pipeline (EJGP) operating?
East Java Gas Pipeline (EJGP) is operating, having started in 1993.
Who owns East Java Gas Pipeline (EJGP)?
East Java Gas Pipeline (EJGP) is owned by PT Pertamina Gas, as recorded in the current tracker release.
Does East Java Gas Pipeline (EJGP) serve an LNG terminal?
East Java Gas Pipeline (EJGP) passes within 25 km of 5 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Indonesia

Listed in name order among the 50 pipelines tracked in Indonesia, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail