Gas transmission pipeline · Cirebon to Semarang
Cirebon-Semarang Gas Pipeline
Cirebon-Semarang Gas Pipeline is an under construction gas transmission pipeline in Indonesia. The tracker lists 1 tracked segment, 305 km long and 5.11 bcm/y of capacity, starting up in 2024. It runs from Cirebon to Semarang. It is owned by PT Pertamina Gas.
Length
305 km
Capacity
5.11 bcm/y
3.8 Mtpa LNG equivalent
Segments tracked
1
Route
Cirebon-Semarang Gas Pipeline runs from Cirebon to Semarang. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Cirebon
- To
- Semarang
- Start country
- Indonesia
- End country
- Indonesia
- Countries crossed
- Indonesia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 209 km
- GEM pipeline ID
- P0964
- Start year
- 2024
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Under construction | Cirebon → Semarang | 305 | 5.11 | — | 2024 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- PT Pertamina Gas100%
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Cirebon-Semarang Gas Pipeline run?
- Cirebon-Semarang Gas Pipeline runs from Cirebon to Semarang, crossing Indonesia.
- How long is Cirebon-Semarang Gas Pipeline?
- Cirebon-Semarang Gas Pipeline is 305 km long.
- How much gas can Cirebon-Semarang Gas Pipeline carry?
- Cirebon-Semarang Gas Pipeline has a design capacity of 5.11 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Cirebon-Semarang Gas Pipeline operating?
- Cirebon-Semarang Gas Pipeline is under construction, with a reported start year of 2024.
- Who owns Cirebon-Semarang Gas Pipeline?
- Cirebon-Semarang Gas Pipeline is owned by PT Pertamina Gas, as recorded in the current tracker release.