Gas transmission pipeline · Riau to Riau
Duri-Dumai Gas Pipeline
Duri-Dumai Gas Pipeline is an operating gas transmission pipeline in Indonesia. The tracker lists 1 tracked segment, 67 km long and 2.04 bcm/y of capacity, starting up in 2018. It runs from Riau to Riau. It is owned by PT Pertamina Gas.
Length
67 km
Capacity
2.04 bcm/y
1.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 610 mm (24 in)
Route
Duri-Dumai Gas Pipeline runs from Riau to Riau. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Riau
- To
- Riau
- Start country
- Indonesia
- End country
- Indonesia
- Countries crossed
- Indonesia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 54 km
- GEM pipeline ID
- P0965
- Start year
- 2018
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Riau → Riau | 67 | 2.04 | 610 mm | 2018 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- PT Pertamina Gas100%
Parent companies
In the news
Recent headlines that name Duri-Dumai Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Duri-Dumai Gas Pipeline run?
- Duri-Dumai Gas Pipeline runs from Riau to Riau, crossing Indonesia.
- How long is Duri-Dumai Gas Pipeline?
- Duri-Dumai Gas Pipeline is 67 km long.
- How much gas can Duri-Dumai Gas Pipeline carry?
- Duri-Dumai Gas Pipeline has a design capacity of 2.04 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Duri-Dumai Gas Pipeline operating?
- Duri-Dumai Gas Pipeline is operating, having started in 2018.
- Who owns Duri-Dumai Gas Pipeline?
- Duri-Dumai Gas Pipeline is owned by PT Pertamina Gas, as recorded in the current tracker release.
More gas pipelines in Indonesia
Listed in name order among the 50 pipelines tracked in Indonesia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- East Java Gas Pipeline (EJGP)495 km
- East Kalimantan – South Kalimantan Gas PipelineEast Kalimantan to South Kalimantan · 1,017 km
- Gresik-Batam-Singapore Gas Pipeline468 km
- Cirebon-KHT Gas PipelineWest Java to West Java · 84 km
- Cirebon-Semarang Gas PipelineWest Java to Central Java · 305 km
- Dumai–Medan Gas Pipeline509 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.