Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project

Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project is an operating gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 181 km long and 8.18 bcm/y of capacity, starting up in 2020. It is owned by Gas Transmission Co Ltd (GTCL).

Length

181 km

Capacity

8.18 bcm/y

6.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project runs from Bangladesh. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
172 km
GEM pipeline ID
P0850
Start year
2020
Estimated cost (GEM, US dollars)
$291,762
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingNot reported1818.18914 mm2020GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Pertamina Bangladesh FSRUBangladeshImportCancelled21.4 kmroute proximity
Cambodia LNG ProjectCambodiaImportCancelled—name match
Filipinas LNG Gateway Project FSRUPhilippinesImportUnder construction—name match
PAWA PNG FSRU ProjectPapua New GuineaImportShelved—name match
Project Venezuela LNG TerminalVenezuelaExportCancelled—name match
Yakutia LNG ProjectRussiaExportProposed—name match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project run?
Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project is recorded in Bangladesh. Global Energy Monitor reports no start and end points for it.
How long is Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project?
Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project is 181 km long.
How much gas can Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project carry?
Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project has a design capacity of 8.18 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project operating?
Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project is operating, having started in 2020.
Who owns Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project?
Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project is owned by Gas Transmission Co Ltd (GTCL), as recorded in the current tracker release.
Does Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project serve an LNG terminal?
Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project passes within 25 km of 6 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Bangladesh

Listed in name order among the 61 pipelines tracked in Bangladesh, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail