Gas transmission pipeline · Bangladesh
Chittagong-Rauzan Gas Pipeline
Chittagong-Rauzan Gas Pipeline is an operating gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 18 km long and 1.53 bcm/y of capacity, starting up in 1980. It is owned by Karnaphuli Gas Distribution Co Ltd (KGDCL).
Length
18 km
Capacity
1.53 bcm/y
1.1 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 508 mm (20 in)
Route
Chittagong-Rauzan Gas Pipeline runs from Bangladesh. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Bangladesh
- End country
- Bangladesh
- Countries crossed
- Bangladesh
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 22 km
- GEM pipeline ID
- P0851
- Start year
- 1980
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 18 | 1.53 | 508 mm | 1980 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Pertamina Bangladesh FSRU | Bangladesh | Import | Cancelled | 14.3 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Parent companies
In the news
Recent headlines that name Chittagong-Rauzan Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Chittagong-Rauzan Gas Pipeline run?
- Chittagong-Rauzan Gas Pipeline is recorded in Bangladesh. Global Energy Monitor reports no start and end points for it.
- How long is Chittagong-Rauzan Gas Pipeline?
- Chittagong-Rauzan Gas Pipeline is 18 km long.
- How much gas can Chittagong-Rauzan Gas Pipeline carry?
- Chittagong-Rauzan Gas Pipeline has a design capacity of 1.53 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Chittagong-Rauzan Gas Pipeline operating?
- Chittagong-Rauzan Gas Pipeline is operating, having started in 1980.
- Who owns Chittagong-Rauzan Gas Pipeline?
- Chittagong-Rauzan Gas Pipeline is owned by Karnaphuli Gas Distribution Co Ltd (KGDCL), as recorded in the current tracker release.
- Does Chittagong-Rauzan Gas Pipeline serve an LNG terminal?
- Chittagong-Rauzan Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Bangladesh
Listed in name order among the 61 pipelines tracked in Bangladesh, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Devpur Kumargaon Gas Pipeline11 km
- Dhaka Clean Fuel Gas Pipeline60 km
- Dhanua-Elenga and Bangabandhu Bridge-Nalka Gas Transmission Pipeline67 km
- Bogra-Rangpur-Nilphamari Transmission Pipeline150 km
- Bonpara-Rajshahi Gas Pipeline53 km
- Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project181 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.