Country
Myanmar: LNG infrastructure
Myanmar has 7 LNG terminals and 9 tracked gas pipelines in the Global Energy Monitor tracker. It operates no LNG terminal capacity, and none is under construction.
Export capacity
—
no export terminal tracked
Import capacity
—
operating regasification
Pipelines
9
10,033 km tracked
Fleet
0
0 owned from here (flag not reported this release)
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 7 | — | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Myanmar
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Ahlone LNG TerminalYangon | Import | Not reported | Cancelled | Not reported | 1 | — |
| Kanbauk FSRU | Import | FSRU | Cancelled | Not reported | 1 | — |
| MCV LNG Terminal | Import | Not reported | Mothballed | 0.4 Mtpa | 1 | 2020 |
| Mee Laung Gyaing FSRUAyeyawady | Import | FSRU | Shelved | Not reported | 1 | — |
| Rakhine LNG TerminalRakhine | Import | Not reported | Cancelled | Not reported | 1 | — |
| Sittwe LNG TerminalRakhine | Import | Not reported | Cancelled | Not reported | 1 | — |
| Thilawa LNG Terminal | Import | Not reported | Cancelled | Not reported | 1 | — |
Gas pipelines crossing Myanmar
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| India-Myanmar-Bangladesh Gas Pipeline | India, Bangladesh, Myanmar | Proposed | 6,900 km | Not reported | 1 | — |
| Kanbauk-Daw Nyein-Kyaiklat Gas Pipeline | Myanmar | Shelved | 370 km | Not reported | 1 | 2024 |
| Sino-Myanmar Gas PipelineGuangxi → Guangxi | Myanmar, China | Operating | 202 km | 0.73 bcm/y | 1 | 2014 |
| Sino-Myanmar Gas PipelineRakhine → Shan State | Myanmar | Operating | 793 km | 12 bcm/y | 1 | 2013 |
| Yadana Gas Pipeline 1 | Myanmar | Operating | 409 km | 5.2 bcm/y | 1 | 1998 |
| Yadana Gas Pipeline 2 | Myanmar | Operating | 287 km | 1.5 bcm/y | 1 | 2010 |
| Yetagun Gas Pipeline | Myanmar, Thailand | Operating | 472 km | 4.1 bcm/y | 1 | 2000 |
| Zawtika Gas Pipeline | Myanmar | Operating | 300 km | 3.53 bcm/y | 1 | 2014 |
| Zawtika Gas Pipeline | Myanmar | Shelved | 300 km | 3.53 bcm/y | 1 | 2022 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.
Neighbouring countries
Countries that share a land border with this one and have tracked LNG infrastructure.
More countries in Asia
Ordered by number of tracked terminals, so countries next to each other here are of similar scale. The region is the one Global Energy Monitor gives this country's terminals.
In our rankings
Where this appears in the site's generated top lists. Each ranking page states its own method before its table.