Gas transmission pipeline · Myanmar
Yadana Gas Pipeline 2
Yadana Gas Pipeline 2 is an operating gas transmission pipeline in Myanmar. The tracker lists 1 tracked segment, 287 km long and 1.5 bcm/y of capacity, starting up in 2010. It is owned by Chevron, PTT Exploration and Production and Myanma Oil and Gas Enterprise.
Length
287 km
Capacity
1.5 bcm/y
1.1 Mtpa LNG equivalent
Segments tracked
1
Route
Yadana Gas Pipeline 2 runs from Myanmar. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Myanmar
- End country
- Myanmar
- Countries crossed
- Myanmar
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 257 km
- GEM pipeline ID
- P1072
- Start year
- 2010
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 287 | 1.5 | — | 2010 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Ahlone LNG Terminal | Myanmar | Import | Cancelled | 0.1 km | route proximity |
| MCV LNG Terminal | Myanmar | Import | Mothballed | 8.6 km | route proximity |
| Thilawa LNG Terminal | Myanmar | Import | Cancelled | 24.1 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Chevron41.1%
- PTT Exploration and Production37.08%
- Myanma Oil and Gas Enterprise21.81%
Parent companies
In the news
Recent headlines that name Yadana Gas Pipeline 2. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Yadana Gas Pipeline 2 run?
- Yadana Gas Pipeline 2 is recorded in Myanmar. Global Energy Monitor reports no start and end points for it.
- How long is Yadana Gas Pipeline 2?
- Yadana Gas Pipeline 2 is 287 km long.
- How much gas can Yadana Gas Pipeline 2 carry?
- Yadana Gas Pipeline 2 has a design capacity of 1.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Yadana Gas Pipeline 2 operating?
- Yadana Gas Pipeline 2 is operating, having started in 2010.
- Who owns Yadana Gas Pipeline 2?
- Yadana Gas Pipeline 2 is owned by Chevron, PTT Exploration and Production and Myanma Oil and Gas Enterprise, as recorded in the current tracker release.
- Does Yadana Gas Pipeline 2 serve an LNG terminal?
- Yadana Gas Pipeline 2 passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Myanmar
Listed in name order among the 8 pipelines tracked in Myanmar, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.