LNG Atlas

Country

Moldova: LNG infrastructure

Moldova has 8 tracked gas pipelines in the Global Energy Monitor tracker. It operates no LNG terminal capacity, and none is under construction.

Export capacity

—

no export terminal tracked

Import capacity

—

no import terminal tracked

Pipelines

8

1,166 km tracked

Fleet

0

0 owned from here (flag not reported this release)

Import and export balance

DirectionTerminalsOperatingUnder construction
Export (liquefaction)0——
Import (regasification)0——

Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.

Gas pipelines crossing Moldova

Any pipeline whose country list includes this country, including transit pipelines that only pass through.

CountriesSegments
Anan'iv-Tiraspol-Izmail Gas PipelineUkraine, MoldovaOperating257 km23.7 bcm/y11968
Ananjiv-Bohorodchani Gas PipelineUkraine, MoldovaOperating333 km9.1 bcm/y11987
Chisinau-Ribnita Gas PipelineMoldovaOperating91 km1.5 bcm/y1—
Odessa-Chisinau Gas PipelineMoldova, UkraineOperating44 km1.3 bcm/y1—
Olishcani-Saharna Gas PipelineMoldovaOperating27 kmNot reported1—
Romania-Moldova Gas PipelineRomania, MoldovaOperating120 km1.5 bcm/y12021
Rozdilna-Izmail Gas PipelineUkraine, MoldovaOperating230 km7.3 bcm/y11975
Tocuz-Cainari-Mereni Gas PipelineMoldovaOperating64 km1.8 bcm/y12007

Chokepoint exposure

Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.

Neighbouring countries

Countries that share a land border with this one and have tracked LNG infrastructure.

Share this page:XLinkedInFacebookBlueskyRedditEmail