Gas transmission pipeline · Odessa to Chisinau
Odessa-Chisinau Gas Pipeline
Odessa-Chisinau Gas Pipeline is an operating gas transmission pipeline crossing Moldova, Ukraine. The tracker lists 1 tracked segment, 44 km long and 1.3 bcm/y of capacity. It runs from Odessa to Chisinau. It is owned by Moldovatransgaz.
Length
44 km
Capacity
1.3 bcm/y
1.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 530 mm (21 in)
Route
Odessa-Chisinau Gas Pipeline runs from Odessa to Chisinau. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Odessa
- To
- Chisinau
- Start country
- Ukraine
- End country
- Moldova
- Countries crossed
- Moldova, Ukraine
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 166 km
- GEM pipeline ID
- P5935
- Start year
- Not reported
- GEM wiki page
- Not reported
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Odessa → Chisinau | 44 | 1.3 | 530 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Moldovatransgaz100%
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Odessa-Chisinau Gas Pipeline run?
- Odessa-Chisinau Gas Pipeline runs from Odessa to Chisinau, crossing Moldova and Ukraine.
- How long is Odessa-Chisinau Gas Pipeline?
- Odessa-Chisinau Gas Pipeline is 44 km long.
- How much gas can Odessa-Chisinau Gas Pipeline carry?
- Odessa-Chisinau Gas Pipeline has a design capacity of 1.3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Odessa-Chisinau Gas Pipeline operating?
- Odessa-Chisinau Gas Pipeline is operating.
- Who owns Odessa-Chisinau Gas Pipeline?
- Odessa-Chisinau Gas Pipeline is owned by Moldovatransgaz, as recorded in the current tracker release.