Import terminal · Wales, United Kingdom
South Hook LNG Terminal
South Hook LNG Terminal is an operating LNG import terminal in Wales, United Kingdom. The tracker lists 2 tracked units with 15.6 Mtpa operating, 4.6 Mtpa proposed, the earliest starting in 2009. Owners include QatarEnergy, ExxonMobil, TotalEnergies and others.
Operating
15.6 Mtpa
21.2 bcm/y · 1 unit
Under construction
—
no units under construction
Proposed
4.6 Mtpa
6.26 bcm/y · 1 unit
At a glance
- Country
- United Kingdom
- State / province
- Wales
- Region
- Europe
- Import / export
- Import
- Onshore / floating
- Not reported
- Status (rolled up)
- Operating
- Trains / phases tracked
- 2
- Earliest start year
- 2009
- Latest start year
- 2009
- Coordinates
- 51.7152° N, 5.0763° W
- GEM terminal ID
- T100000130557
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Operating | 15.6 | 21.2 | 2009 | — | Not reported | QatarEnergy [67%]; Exxon Mobil Corp [24%]; TotalEnergies SE [8%] |
| Expansion | Proposed | 4.6 | 6.26 | — | 2022 | Not reported | QatarEnergy [67%]; Exxon Mobil Corp [24%]; TotalEnergies SE [8%] |
Capacity by status
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Location
South Hook LNG Terminal at 51.7152° N, 5.0763° W, with 1 tracked gas pipeline passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 51.7152° N, 5.0763° W
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| National Transmission System | Operating | 7,650 km | — | 0.5 km | route proximity |
Vessels owned by the same companies
Ships in the tracker held by a company that also owns, operates or parents this terminal. A shared owner is not the same as a dedicated trade.
| Vessel | Via | Status | Capacity | Delivered |
|---|---|---|---|---|
| BW Boston | TotalEnergies | Operating | 138,000 m³ | 2003 |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.
In the news
Recent headlines that name South Hook LNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is South Hook LNG Terminal?
- South Hook LNG Terminal is an LNG import terminal in Wales, United Kingdom. It is made up of 2 tracked trains and phases.
- Is South Hook LNG Terminal operating?
- South Hook LNG Terminal is operating, with its first tracked train starting in 2009.
- How much LNG can South Hook LNG Terminal handle?
- South Hook LNG Terminal has 15.6 Mtpa operating, 4.6 Mtpa proposed, equivalent to 21.2 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
- Who owns South Hook LNG Terminal?
- South Hook LNG Terminal is owned by QatarEnergy, ExxonMobil and TotalEnergies, and operated by South Hook LNG Terminal. Shares are as recorded in the current tracker release.
- Which maritime chokepoints do cargoes from South Hook LNG Terminal pass?
- Cargoes from South Hook LNG Terminal would normally pass Strait of Gibraltar, Suez Canal, Bab el-Mandeb and Danish Straits. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
- What pipelines connect to South Hook LNG Terminal?
- 1 tracked gas pipeline passes within 25 km of South Hook LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
In our rankings
Where this appears in the site's generated top lists. Each ranking page states its own method before its table.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.