San Pedro de Macoris LNG Terminal is a cancelled LNG import terminal in San Pedro Macorís, Dominican Republic. The tracker lists 1 tracked unit; capacity is not reported. Owners include BW Group, InterEnergy Holdings, Ipson and 2 others.

Operating

—

no units operating

Under construction

—

no units under construction

Proposed

—

no units proposed

At a glance

State / province
San Pedro Macorís
Region
Americas
Import / export
Import
Onshore / floating
Not reported
Status (rolled up)
Cancelled
Trains / phases tracked
1
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
18.4500° N, 69.3000° W
GEM terminal ID
T100000130567
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Not reportedCancelled11.36——Not reportedBW Group; InterEnergy Holdings; Ipson; Promigas SA ESP; Coastal

Capacity by status

StatusUnitsMtpabcm/y
Cancelled111.36

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Reported cost

Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.

UnitStatusCapacityEstimated costPer tonne a year
Not reportedCancelled1 Mtpa$350 million$350

A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.

Location

San Pedro de Macoris LNG Terminal at 18.4500° N, 69.3000° W, with 1 tracked gas pipeline passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
18.4500° N, 69.3000° W
Coordinate accuracy (GEM)
approximate
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Gasoducto del Este Gas PipelineOperating50 km2.56 bcm/y4.7 kmroute proximity

Vessels owned by the same companies

Ships in the tracker held by a company that also owns, operates or parents this terminal. A shared owner is not the same as a dedicated trade.

VesselViaStatusCapacityDelivered
BW BatangasBW GroupOperating162,400 m³2009
BW BorealisBW GroupOperating174,000 m³2025
BW BostonBW GroupOperating138,000 m³2003
BW BrusselsBW GroupOperating162,500 m³2009
BW CassiaBW GroupOperating174,000 m³2022
BW Clear SkyBW GroupOperating173,000 m³2011
BW ENN Snow LotusBW GroupOperating174,000 m³2022
BW HeliosBW GroupOperating174,000 m³2021
BW IntegrityBW GroupOperating173,400 m³2017
BW LesmesBW GroupOperating174,000 m³2021
BW LilacBW GroupOperating173,400 m³2018
BW MagnaBW GroupOperating173,400 m³2019
BW MagnoliaBW GroupOperating173,400 m³2020
BW NivalisBW GroupOperating174,000 m³2025
BW Pavilion ArandaBW GroupOperating173,400 m³2019
BW Pavilion ArantheraBW GroupOperating170,800 m³2020
BW Pavilion LeearaBW GroupOperating162,000 m³2015
BW Pavilion VandaBW GroupOperating162,000 m³2015
BW TatianaBW GroupOperating136,600 m³2002
BW TulipBW GroupOperating173,400 m³2018
Berge ArzewBW GroupOperating138,000 m³2004
LNG BenueBW GroupOperating145,700 m³2006
LNG EnuguBW GroupOperating145,000 m³2005
LNG ImoBW GroupOperating148,500 m³2008
LNG KanoBW GroupOperating148,300 m³2007
LNG LokojaBW GroupOperating148,300 m³2006
LNG OndoBW GroupOperating148,300 m³2007
LNG OyoBW GroupOperating145,800 m³2005
LNG River OrashiBW GroupOperating145,900 m³2004
Pan AfricaBW GroupOperating174,000 m³2019
Venture AcadiaBW GroupOperating174,000 m³2025
Venture CreoleBW GroupOperating174,000 m³2025

Supplied via

Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.

Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is San Pedro de Macoris LNG Terminal?
San Pedro de Macoris LNG Terminal is an LNG import terminal in San Pedro Macorís, Dominican Republic. It is made up of 1 tracked train or phase.
Is San Pedro de Macoris LNG Terminal operating?
San Pedro de Macoris LNG Terminal is cancelled. Nothing here should be read as a forecast that it will be built.
How much LNG can San Pedro de Macoris LNG Terminal handle?
Global Energy Monitor reports no capacity for San Pedro de Macoris LNG Terminal, so none is shown. That is an absent figure, not a zero.
Who owns San Pedro de Macoris LNG Terminal?
San Pedro de Macoris LNG Terminal is owned by BW Group, Coastal, InterEnergy Holdings and 2 others. Shares are as recorded in the current tracker release.
Which maritime chokepoints do cargoes from San Pedro de Macoris LNG Terminal pass?
Cargoes from San Pedro de Macoris LNG Terminal would normally pass Panama Canal. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
What pipelines connect to San Pedro de Macoris LNG Terminal?
1 tracked gas pipeline passes within 25 km of San Pedro de Macoris LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.