LNG Atlas

Import terminal · Pays de la Loire, France

Montoir LNG Terminal

Montoir LNG Terminal is an operating LNG import terminal in Pays de la Loire, France. The tracker lists 2 tracked units with 8 Mtpa operating, 1.84 Mtpa proposed, the earliest starting in 1980. It is owned by Elengy.

Operating

8 Mtpa

10.9 bcm/y · 1 unit

Under construction

—

no units under construction

Proposed

1.84 Mtpa

2.5 bcm/y · 1 unit

At a glance

Country
France
State / province
Pays de la Loire
Region
Europe
Import / export
Import
Onshore / floating
Not reported
Status (rolled up)
Operating
Trains / phases tracked
2
Earliest start year
1980
Latest start year
1980
Coordinates
47.3030° N, 2.1428° W
GEM terminal ID
T100000130456
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Not reportedOperating810.91980—Not reportedElengy
ExpansionProposed1.842.5—2019Not reportedElengy

Capacity by status

StatusUnitsMtpabcm/y
Operating1810.9
Proposed11.842.5

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Owners

Parent companies

Operators

Reported cost

Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.

UnitStatusCapacityEstimated costPer tonne a year
ExpansionProposed1.84 Mtpa$545 million500,000,000 EUR as reported$296

A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.

Location

Montoir LNG Terminal at 47.3030° N, 2.1428° W, with 2 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
47.3030° N, 2.1428° W
Coordinate accuracy (GEM)
exact
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
NaTran Gas Pipeline NetworkOperating29,574 km—0.4 kmroute proximity
NaTran Gas Pipeline NetworkShelved220 km—0.4 kmroute proximity

Supplied via

Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.

Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.

Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, browse every chokepoint, or take the machine-readable exposure feed.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Montoir LNG Terminal?
Montoir LNG Terminal is an LNG import terminal in Pays de la Loire, France. It is made up of 2 tracked trains and phases.
Is Montoir LNG Terminal operating?
Montoir LNG Terminal is operating, with its first tracked train starting in 1980.
How much LNG can Montoir LNG Terminal handle?
Montoir LNG Terminal has 8 Mtpa operating, 1.84 Mtpa proposed, equivalent to 10.9 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
Who owns Montoir LNG Terminal?
Montoir LNG Terminal is owned by Elengy, and operated by Elengy. Shares are as recorded in the current tracker release.
Which maritime chokepoints do cargoes from Montoir LNG Terminal pass?
Cargoes from Montoir LNG Terminal would normally pass Strait of Gibraltar, Suez Canal, Bab el-Mandeb and Danish Straits. This is an editorial model of typical laden voyages by destination market, not vessel tracking, and any individual cargo may go another way.
What pipelines connect to Montoir LNG Terminal?
2 tracked gas pipelines pass within 25 km of Montoir LNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.

In our rankings

Where this appears in the site's generated top lists. Each ranking page states its own method before its table.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail