LNG Chain

Import terminal · Quảng Trị, Vietnam

Hai Lang LNG Terminal

Hai Lang LNG Terminal is a proposed LNG import terminal in Quảng Trị, Vietnam. The tracker lists 1 tracked unit with 1.5 Mtpa proposed. Owners include T&T Group JSC, Hanwha Energy Corp, KOGAS and 1 other.

Operating

no units operating

Under construction

no units under construction

Proposed

1.5 Mtpa

2.04 bcm/y · 1 unit

At a glance

Country
Vietnam
State / province
Quảng Trị
Region
Not reported
Import / export
Import
Onshore / floating
Not reported
Status (rolled up)
Proposed
Trains / phases tracked
1
Earliest start year
Not reported
Latest start year
Not reported
Coordinates
16.9944° N, 107.1154° E
GEM terminal ID
T100000131059
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Not reportedProposed1.52.04Not reportedT&T Group JSC [40%]; Hanwha Energy Corp [20%]; Korea Gas Corp [20%]; Korea Southern Power Co Ltd [20%]

Capacity by status

StatusUnitsMtpabcm/y
Proposed11.52.04

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Location

Hai Lang LNG Terminal at 16.9944° N, 107.1154° E.

Loads about 250 kB of map code and the country outline file.

Coordinates
16.9944° N, 107.1154° E
Coordinate accuracy (GEM)
approximate
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

No tracked gas pipeline passes within 25 km of this terminal in the current release.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Hai Lang LNG Terminal?
Hai Lang LNG Terminal is an LNG import terminal in Quảng Trị, Vietnam. It is made up of 1 tracked train or phase.
Is Hai Lang LNG Terminal operating?
Hai Lang LNG Terminal is proposed. Nothing here should be read as a forecast that it will be built.
How much LNG can Hai Lang LNG Terminal handle?
Hai Lang LNG Terminal has 1.5 Mtpa proposed. Capacity at different statuses is never added together.
Who owns Hai Lang LNG Terminal?
Hai Lang LNG Terminal is owned by T&T Group JSC, Hanwha Energy Corp, KOGAS and 1 other. Shares are as recorded in the current tracker release.