Export terminal · Republic of the Congo
Eni Congo FLNG II Terminal
Eni Congo FLNG II Terminal is an under construction LNG export terminal (floating liquefaction (FLNG) facility) in Republic of the Congo. The tracker lists 1 tracked unit with 2.4 Mtpa under construction. It is owned by Eni Congo SAU.
Operating
—
no units operating
Under construction
2.4 Mtpa
3.26 bcm/y · 1 unit
Proposed
—
no units proposed
At a glance
- Country
- Republic of the Congo
- State / province
- Not reported
- Region
- Africa
- Import / export
- Export
- Onshore / floating
- FLNG
- Status (rolled up)
- Under construction
- Trains / phases tracked
- 1
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 4.5902° S, 11.4703° E
- GEM terminal ID
- T100000131123
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Not reported | Under construction | 2.4 | 3.27 | — | 2022 | FID | Eni Congo SAU [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Under construction | 1 | 2.4 | 3.26 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
- Eni Congo SAU100%
Parent companies
- Eni100%
Reported cost
Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.
| Unit | Status | Capacity | Estimated cost | Per tonne a year |
|---|---|---|---|---|
| Not reported | Under construction | 2.4 Mtpa | $4 billion | $1,667 |
A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.
Power, vessels and projects tied to this terminal
Floating vessels named by GEM
- Nguya FLNG
The terminal and carrier workbooks share no identifier, so a name is linked to a carrier page only where it matches exactly one tracked vessel by name. A name with no link is not in the carrier tracker under that name.
Location
Eni Congo FLNG II Terminal at 4.5902° S, 11.4703° E, with 1 tracked gas pipeline passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 4.5902° S, 11.4703° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Angola LNG Gas Pipeline System | Operating | 500 km | 7.67 bcm/y | 6.8 km | route proximity |
In the news
Recent headlines that name Eni Congo FLNG II Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Eni Congo FLNG II Terminal?
- Eni Congo FLNG II Terminal is an LNG export terminal in Republic of the Congo. It is made up of 1 tracked train or phase.
- Is Eni Congo FLNG II Terminal operating?
- Eni Congo FLNG II Terminal is under construction. Nothing here should be read as a forecast that it will be built.
- How much LNG can Eni Congo FLNG II Terminal handle?
- Eni Congo FLNG II Terminal has 2.4 Mtpa under construction. Capacity at different statuses is never added together.
- Who owns Eni Congo FLNG II Terminal?
- Eni Congo FLNG II Terminal is owned by Eni Congo SAU. Shares are as recorded in the current tracker release.
- What pipelines connect to Eni Congo FLNG II Terminal?
- 1 tracked gas pipeline passes within 25 km of Eni Congo FLNG II Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.