LNG Atlas

Export terminal · Republic of the Congo

Congo FLNG Terminal

Congo FLNG Terminal is an operating LNG export terminal (floating liquefaction (FLNG) facility) in Republic of the Congo. The tracker lists 1 tracked unit with 0.6 Mtpa operating, the earliest starting in 2023. It is owned by Vitol and Eni Congo SAU.

Operating

0.6 Mtpa

0.82 bcm/y · 1 unit

Under construction

—

no units under construction

Proposed

—

no units proposed

At a glance

State / province
Not reported
Region
Africa
Import / export
Export
Onshore / floating
FLNG
Status (rolled up)
Operating
Trains / phases tracked
1
Earliest start year
2023
Latest start year
2023
Coordinates
4.8930° S, 11.8810° E
GEM terminal ID
T100000131003
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Not reportedOperating0.60.8220232022FIDVitol SA [25%]; Eni Congo SAU [75%]

Capacity by status

StatusUnitsMtpabcm/y
Operating10.60.82

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Owners

Parent companies

Reported cost

Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.

UnitStatusCapacityEstimated costPer tonne a year
Not reportedOperating0.6 Mtpa$1 billion$1,667

A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.

Location

Congo FLNG Terminal at 4.8930° S, 11.8810° E, with 1 tracked gas pipeline passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
4.8930° S, 11.8810° E
Coordinate accuracy (GEM)
exact
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Angola LNG Gas Pipeline SystemOperating500 km7.67 bcm/y20 kmroute proximity

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where is Congo FLNG Terminal?
Congo FLNG Terminal is an LNG export terminal in Republic of the Congo. It is made up of 1 tracked train or phase.
Is Congo FLNG Terminal operating?
Congo FLNG Terminal is operating, with its first tracked train starting in 2023.
How much LNG can Congo FLNG Terminal handle?
Congo FLNG Terminal has 0.6 Mtpa operating, equivalent to 0.82 bcm/y of gas a year in operation. Capacity at different statuses is never added together.
Who owns Congo FLNG Terminal?
Congo FLNG Terminal is owned by Eni Congo SAU and Vitol. Shares are as recorded in the current tracker release.
What pipelines connect to Congo FLNG Terminal?
1 tracked gas pipeline passes within 25 km of Congo FLNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail