LNG Chain

Gas transmission pipeline · Grand Chenier to Cameron

TransCameron Pipeline

TransCameron Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 39 km long and 19.42 bcm/y of capacity, starting up in 2021. It runs from Grand Chenier to Cameron. It is owned by TransCameron Pipeline LLC.

Length

39 km

Capacity

19.4 bcm/y

14.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1067 mm (42 in)

Route

TransCameron Pipeline runs from Grand Chenier to Cameron. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Grand Chenier
To
Cameron
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
34 km
GEM pipeline ID
P0269
Start year
2021
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingGrand Chenier → Cameron3919.41067 mm2021GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Monkey Island LNG TerminalUnited StatesExportProposed1.4 kmroute proximity
CP2 LNG TerminalUnited StatesExportUnder construction2.3 kmroute proximity
Calcasieu Pass LNG TerminalUnited StatesExportOperating2.6 kmroute proximity
G2 LNG TerminalUnited StatesExportCancelled3.6 kmroute proximity
Commonwealth LNG TerminalUnited StatesExportUnder construction4 kmroute proximity
Creole Trail LNG TerminalUnited StatesImportCancelled7.2 kmroute proximity
Gulf Gateway Deepwater Port LNG TerminalUnited StatesImportRetired7.2 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does TransCameron Pipeline run?
TransCameron Pipeline runs from Grand Chenier to Cameron, crossing United States.
How long is TransCameron Pipeline?
TransCameron Pipeline is 39 km long.
How much gas can TransCameron Pipeline carry?
TransCameron Pipeline has a design capacity of 19.4 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is TransCameron Pipeline operating?
TransCameron Pipeline is operating, having started in 2021.
Who owns TransCameron Pipeline?
TransCameron Pipeline is owned by TransCameron Pipeline LLC, as recorded in the current tracker release.
Does TransCameron Pipeline serve an LNG terminal?
TransCameron Pipeline passes within 25 km of 7 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.