LNG Chain

Gas transmission pipeline · Nevada to Nevada

Spring Creek Gas Infrastructure Expansion Project

Spring Creek Gas Infrastructure Expansion Project is an under construction gas transmission pipeline in United States. The tracker lists 1 tracked segment, 35 km long, starting up in 2027. It runs from Nevada to Nevada. It is owned by Southwest Gas Holdings Inc.

Length

35 km

Capacity

Not reported

Segments tracked

1

Route

Spring Creek Gas Infrastructure Expansion Project runs from Nevada to Nevada. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Nevada
To
Nevada
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
19 km
GEM pipeline ID
P7823
Start year
2027
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
BackboneUnder constructionNevada → Nevada35Not reported2027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Cambodia LNG ProjectCambodiaImportCancelledname match
Filipinas LNG Gateway Project FSRUPhilippinesImportShelvedname match
Project Venezuela LNG TerminalVenezuelaExportCancelledname match
Yakutia LNG ProjectRussiaExportShelvedname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Spring Creek Gas Infrastructure Expansion Project run?
Spring Creek Gas Infrastructure Expansion Project runs from Nevada to Nevada, crossing United States.
How long is Spring Creek Gas Infrastructure Expansion Project?
Spring Creek Gas Infrastructure Expansion Project is 35 km long.
How much gas can Spring Creek Gas Infrastructure Expansion Project carry?
No design capacity is reported for Spring Creek Gas Infrastructure Expansion Project. That is an absent figure, not a zero.
Is Spring Creek Gas Infrastructure Expansion Project operating?
Spring Creek Gas Infrastructure Expansion Project is under construction, with a reported start year of 2027.
Who owns Spring Creek Gas Infrastructure Expansion Project?
Spring Creek Gas Infrastructure Expansion Project is owned by Southwest Gas Holdings Inc, as recorded in the current tracker release.
Does Spring Creek Gas Infrastructure Expansion Project serve an LNG terminal?
Spring Creek Gas Infrastructure Expansion Project passes within 25 km of 4 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.