LNG Chain

Gas transmission pipeline · Millazo to Montesano sulla Marcellana

Sealine Tirrenica Gas Pipeline

Sealine Tirrenica Gas Pipeline is a cancelled gas transmission pipeline in Italy. The tracker lists 1 tracked segment, 255 km long, starting up in 2034. It runs from Millazo to Montesano sulla Marcellana. It is owned by Snam Rete Gas SpA.

Length

255 km

Capacity

Not reported

Segments tracked

1

Largest diameter 787 mm (31 in)

Route

Sealine Tirrenica Gas Pipeline runs from Millazo to Montesano sulla Marcellana. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Millazo
To
Montesano sulla Marcellana
Start country
Italy
End country
Italy
Countries crossed
Italy
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
246 km
GEM pipeline ID
P2728
Start year
2034
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Additional Southern developments - Section 1CancelledMillazo → Montesano sulla Marcellana255Not reported787 mm2034GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Sealine Tirrenica Gas Pipeline run?
Sealine Tirrenica Gas Pipeline runs from Millazo to Montesano sulla Marcellana, crossing Italy.
How long is Sealine Tirrenica Gas Pipeline?
Sealine Tirrenica Gas Pipeline is 255 km long.
How much gas can Sealine Tirrenica Gas Pipeline carry?
No design capacity is reported for Sealine Tirrenica Gas Pipeline. That is an absent figure, not a zero.
Is Sealine Tirrenica Gas Pipeline operating?
Sealine Tirrenica Gas Pipeline is cancelled, with a reported start year of 2034.
Who owns Sealine Tirrenica Gas Pipeline?
Sealine Tirrenica Gas Pipeline is owned by Snam Rete Gas SpA, as recorded in the current tracker release.