LNG Chain

Gas transmission pipeline · Louisiana to Gillis

New Generation Gas Gathering (NG3) Project

New Generation Gas Gathering (NG3) Project is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 443 km long and 17.37 bcm/y of capacity, starting up in 2025. It runs from Louisiana to Gillis.

Length

443 km

Capacity

17.4 bcm/y

12.8 Mtpa LNG equivalent

Segments tracked

1

Route

New Generation Gas Gathering (NG3) Project runs from Louisiana to Gillis. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Louisiana
To
Gillis
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
391 km
GEM pipeline ID
P5417
Start year
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingLouisiana → Gillis44317.42025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Cambodia LNG ProjectCambodiaImportCancelledname match
Filipinas LNG Gateway Project FSRUPhilippinesImportShelvedname match
Project Venezuela LNG TerminalVenezuelaExportCancelledname match
Yakutia LNG ProjectRussiaExportShelvedname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does New Generation Gas Gathering (NG3) Project run?
New Generation Gas Gathering (NG3) Project runs from Louisiana to Gillis, crossing United States.
How long is New Generation Gas Gathering (NG3) Project?
New Generation Gas Gathering (NG3) Project is 443 km long.
How much gas can New Generation Gas Gathering (NG3) Project carry?
New Generation Gas Gathering (NG3) Project has a design capacity of 17.4 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is New Generation Gas Gathering (NG3) Project operating?
New Generation Gas Gathering (NG3) Project is operating, having started in 2025.
Who owns New Generation Gas Gathering (NG3) Project?
Ownership of New Generation Gas Gathering (NG3) Project is not reported in the current tracker release.
Does New Generation Gas Gathering (NG3) Project serve an LNG terminal?
New Generation Gas Gathering (NG3) Project passes within 25 km of 4 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.