Gas transmission pipeline · Greenville to Butler

Mississippi Crossing Project

Mississippi Crossing Project is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 335 km long and 21.46 bcm/y of capacity, starting up in 2028. It runs from Greenville to Butler. It is owned by Kinder Morgan Inc.

Length

335 km

Capacity

21.5 bcm/y

15.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1067 mm (42 in)

Route

Mississippi Crossing Project runs from Greenville to Butler. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Greenville
To
Butler
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
324 km
GEM pipeline ID
P7841
Start year
2028
GEM wiki page
Not reported

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedGreenville → Butler33521.51067 mm2028GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Bay Crossing LNG TerminalUnited StatesImportCancelledname match
Cambodia LNG ProjectCambodiaImportCancelledname match
Filipinas LNG Gateway Project FSRUPhilippinesImportShelvedname match
Project Venezuela LNG TerminalVenezuelaExportCancelledname match
Yakutia LNG ProjectRussiaExportShelvedname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Mississippi Crossing Project run?
Mississippi Crossing Project runs from Greenville to Butler, crossing United States.
How long is Mississippi Crossing Project?
Mississippi Crossing Project is 335 km long.
How much gas can Mississippi Crossing Project carry?
Mississippi Crossing Project has a design capacity of 21.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Mississippi Crossing Project operating?
Mississippi Crossing Project is proposed, with a reported start year of 2028.
Who owns Mississippi Crossing Project?
Mississippi Crossing Project is owned by Kinder Morgan Inc, as recorded in the current tracker release.
Does Mississippi Crossing Project serve an LNG terminal?
Mississippi Crossing Project passes within 25 km of 5 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.