Gas transmission pipeline · Starr County to Monterrey
Mier Monterrey Gas Pipeline
Mier Monterrey Gas Pipeline is an operating gas transmission pipeline crossing United States, Mexico. The tracker lists 1 tracked segment, 145 km long and 6.54 bcm/y of capacity, starting up in 2003. It runs from Starr County to Monterrey. It is owned by Kinder Morgan Inc.
Length
145 km
Capacity
6.54 bcm/y
4.8 Mtpa LNG equivalent
Segments tracked
1
Route
Mier Monterrey Gas Pipeline runs from Starr County to Monterrey. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Starr County
- To
- Monterrey
- Start country
- United States
- End country
- Mexico
- Countries crossed
- United States, Mexico
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 139 km
- GEM pipeline ID
- P0215
- Start year
- 2003
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Starr County → Monterrey | 145 | 6.54 | — | 2003 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Mier Monterrey Gas Pipeline run?
- Mier Monterrey Gas Pipeline runs from Starr County to Monterrey, crossing United States and Mexico.
- How long is Mier Monterrey Gas Pipeline?
- Mier Monterrey Gas Pipeline is 145 km long.
- How much gas can Mier Monterrey Gas Pipeline carry?
- Mier Monterrey Gas Pipeline has a design capacity of 6.54 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Mier Monterrey Gas Pipeline operating?
- Mier Monterrey Gas Pipeline is operating, having started in 2003.
- Who owns Mier Monterrey Gas Pipeline?
- Mier Monterrey Gas Pipeline is owned by Kinder Morgan Inc, as recorded in the current tracker release.