Gas transmission pipeline · Republic of Adygea to Krasnodar Krai
Maykop-Samur-Sochi Pipeline
Maykop-Samur-Sochi Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 186 km long and 2 bcm/y of capacity, starting up in 1975. It runs from Republic of Adygea to Krasnodar Krai. It is owned by Gazprom PJSC.
Length
186 km
Capacity
2 bcm/y
1.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 17780 mm (700 in)
Route
Maykop-Samur-Sochi Pipeline runs from Republic of Adygea to Krasnodar Krai. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Republic of Adygea
- To
- Krasnodar Krai
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 205 km
- GEM pipeline ID
- P1475
- Start year
- 1975
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Republic of Adygea → Krasnodar Krai | 186 | 2 | 17780 mm | 1975 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%
In the news
Recent headlines that name Maykop-Samur-Sochi Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Maykop-Samur-Sochi Pipeline run?
- Maykop-Samur-Sochi Pipeline runs from Republic of Adygea to Krasnodar Krai, crossing Russia.
- How long is Maykop-Samur-Sochi Pipeline?
- Maykop-Samur-Sochi Pipeline is 186 km long.
- How much gas can Maykop-Samur-Sochi Pipeline carry?
- Maykop-Samur-Sochi Pipeline has a design capacity of 2 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Maykop-Samur-Sochi Pipeline operating?
- Maykop-Samur-Sochi Pipeline is operating, having started in 1975.
- Who owns Maykop-Samur-Sochi Pipeline?
- Maykop-Samur-Sochi Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.
More gas pipelines in Russia
Listed in name order among the 266 pipelines tracked in Russia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Medvezhye-Nadym Gas PipelineYamalo-Nenets Autonomus Okrug to Yamalo-Nenets Autonomus Okrug · 118 km
- Medvezhye-Nadym Gas PipelineYamalo-Nenets Autonomus Okrug to Yamalo-Nenets Autonomus Okrug · 115 km
- Messoyakha-Norilsk PipelineKrasnoyarsk Krai to Krasnoyarsk Krai · 263 km
- Magnitogorsk-Sterlitamak Gas PipelineChelyabinsk region to Republic of Bashkortostan · 208 km
- Mannovka-Ust-Luga Gas PipelineLeningrad Oblast to Leningrad Oblast · 21 km
- Maykop-Nevinnomyssk Gas PipelineReublic of Adygea to Stavropol Krai · 155 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.