Mannovka-Ust-Luga Gas Pipeline is a proposed gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 21 km long and 0.74 bcm/y of capacity. It runs from Mannovka to Ust-Luga. It is owned by Gazprom PJSC.

Length

21 km

Capacity

0.74 bcm/y

0.5 Mtpa LNG equivalent

Segments tracked

1

Route

Mannovka-Ust-Luga Gas Pipeline runs from Mannovka to Ust-Luga. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Mannovka
To
Ust-Luga
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
21 km
GEM pipeline ID
P4109
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedMannovka → Ust-Luga210.74GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Ust Luga LNG TerminalRussiaExportUnder construction9.6 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Mannovka-Ust-Luga Gas Pipeline run?
Mannovka-Ust-Luga Gas Pipeline runs from Mannovka to Ust-Luga, crossing Russia.
How long is Mannovka-Ust-Luga Gas Pipeline?
Mannovka-Ust-Luga Gas Pipeline is 21 km long.
How much gas can Mannovka-Ust-Luga Gas Pipeline carry?
Mannovka-Ust-Luga Gas Pipeline has a design capacity of 0.74 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Mannovka-Ust-Luga Gas Pipeline operating?
Mannovka-Ust-Luga Gas Pipeline is proposed.
Who owns Mannovka-Ust-Luga Gas Pipeline?
Mannovka-Ust-Luga Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.
Does Mannovka-Ust-Luga Gas Pipeline serve an LNG terminal?
Mannovka-Ust-Luga Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.