Gas transmission pipeline · Reublic of Adygea to Nevinomyssk
Maykop-Nevinnomyssk Gas Pipeline
Maykop-Nevinnomyssk Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 155 km long and 2.5 bcm/y of capacity, starting up in 1964. It runs from Reublic of Adygea to Nevinomyssk. It is owned by Gazprom PJSC.
Length
155 km
Capacity
2.5 bcm/y
1.8 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 720 mm (28 in)
Route
Maykop-Nevinnomyssk Gas Pipeline runs from Reublic of Adygea to Nevinomyssk. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Reublic of Adygea
- To
- Nevinomyssk
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 154 km
- GEM pipeline ID
- P2339
- Start year
- 1964
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Reublic of Adygea → Nevinomyssk | 155 | 2.5 | 720 mm | 1964 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Maykop-Nevinnomyssk Gas Pipeline run?
- Maykop-Nevinnomyssk Gas Pipeline runs from Reublic of Adygea to Nevinomyssk, crossing Russia.
- How long is Maykop-Nevinnomyssk Gas Pipeline?
- Maykop-Nevinnomyssk Gas Pipeline is 155 km long.
- How much gas can Maykop-Nevinnomyssk Gas Pipeline carry?
- Maykop-Nevinnomyssk Gas Pipeline has a design capacity of 2.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Maykop-Nevinnomyssk Gas Pipeline operating?
- Maykop-Nevinnomyssk Gas Pipeline is operating, having started in 1964.
- Who owns Maykop-Nevinnomyssk Gas Pipeline?
- Maykop-Nevinnomyssk Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.