Gas transmission pipeline · Poland
Kędzierzyn-Racibórz Gas Pipeline
Kędzierzyn-Racibórz Gas Pipeline is an operating gas transmission pipeline in Poland. The tracker lists 1 tracked segment, 37 km long, starting up in 2025. It is owned by Gaz-System.
Length
37 km
Capacity
Not reported
Segments tracked
1
Largest diameter 25400 mm (1000 in)
Route
Kędzierzyn-Racibórz Gas Pipeline runs from Poland. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Poland
- End country
- Poland
- Countries crossed
- Poland
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 28 km
- GEM pipeline ID
- P5987
- Start year
- 2025
- Estimated cost (GEM, US dollars)
- $89.6 million
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 37 | Not reported | 25400 mm | 2025 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gaz-System100%
Parent companies
In the news
Recent headlines that name Kędzierzyn-Racibórz Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Kędzierzyn-Racibórz Gas Pipeline run?
- Kędzierzyn-Racibórz Gas Pipeline is recorded in Poland. Global Energy Monitor reports no start and end points for it.
- How long is Kędzierzyn-Racibórz Gas Pipeline?
- Kędzierzyn-Racibórz Gas Pipeline is 37 km long.
- How much gas can Kędzierzyn-Racibórz Gas Pipeline carry?
- No design capacity is reported for Kędzierzyn-Racibórz Gas Pipeline. That is an absent figure, not a zero.
- Is Kędzierzyn-Racibórz Gas Pipeline operating?
- Kędzierzyn-Racibórz Gas Pipeline is operating, having started in 2025.
- Who owns Kędzierzyn-Racibórz Gas Pipeline?
- Kędzierzyn-Racibórz Gas Pipeline is owned by Gaz-System, as recorded in the current tracker release.
More gas pipelines in Poland
Listed in name order among the 48 pipelines tracked in Poland, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.